MANDT |
Client |
MANDT |
T000
|
CLNT |
|
3 |
0 |
|
AUFPL |
Routing number of operations in the order |
CO_AUFPL |
|
NUMC |
|
10 |
0 |
|
APLZL |
General counter for order |
CO_APLZL |
AFVC
|
NUMC |
|
8 |
0 |
|
MEINH |
Unit of Measure for Activity/Operation |
VORME |
T006
|
UNIT |
|
3 |
0 |
|
UMREN |
Denominator for converting rtg and op units of measure |
CP_UMREN |
|
DEC |
|
5 |
0 |
|
UMREZ |
Numerator for converting task list and oper. un. of measure |
CP_UMREZ |
|
DEC |
|
5 |
0 |
|
BMSCH |
Base Quantity |
BMSCH |
|
QUAN |
|
13 |
3 |
|
ZMERH |
Break |
DZMERH |
|
QUAN |
|
9 |
3 |
|
ZEIER |
Unit for the break time |
DZEIER |
T006
|
UNIT |
|
3 |
0 |
|
VGE01 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW01 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
VGE02 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW02 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
VGE03 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW03 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
VGE04 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW04 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
VGE05 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW05 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
VGE06 |
Unit of measure for the standard value |
VGWRTEH |
T006
|
UNIT |
|
3 |
0 |
|
VGW06 |
Standard Value |
VGWRT |
|
QUAN |
|
9 |
3 |
|
ZEIMU |
Unit for the minimum overlap time |
DZEIMU |
T006
|
UNIT |
|
3 |
0 |
|
ZMINU |
Minimum overlap time |
DZMINU |
|
QUAN |
|
9 |
3 |
|
MINWE |
Minimum Send-Ahead Quantity |
MINWEI |
|
QUAN |
|
13 |
3 |
|
ZEIMB |
Unit for the minimum processing time |
DZEIMB |
T006
|
UNIT |
|
3 |
0 |
|
ZMINB |
Minimum processing time |
DZMINB |
|
QUAN |
|
9 |
3 |
|
ZEILM |
Unit for the maximum wait time |
DZEILM |
T006
|
UNIT |
|
3 |
0 |
|
ZLMAX |
Maximum wait time |
DZLMAX |
|
QUAN |
|
9 |
3 |
|
ZEILP |
Unit for the required wait time |
DZEILP |
T006
|
UNIT |
|
3 |
0 |
|
ZLPRO |
Minimum wait time |
DZLPRO |
|
QUAN |
|
9 |
3 |
|
ZEIWN |
Unit for the standard queue time |
DZEIWN |
T006
|
UNIT |
|
3 |
0 |
|
ZWNOR |
Standard queue time |
DZWNOR |
|
QUAN |
|
9 |
3 |
|
ZEIWM |
Unit for the minumum queue time |
DZEIWM |
T006
|
UNIT |
|
3 |
0 |
|
ZWMIN |
Minimum queue time |
DZWMIN |
|
QUAN |
|
9 |
3 |
|
ZEITN |
Unit for the standard move time |
DZEITN |
T006
|
UNIT |
|
3 |
0 |
|
ZTNOR |
Standard move time |
DZTNOR |
|
QUAN |
|
9 |
3 |
|
ZEITM |
Unit for the minimum move time |
DZEITM |
T006
|
UNIT |
|
3 |
0 |
|
ZTMIN |
Minimum move time |
DZTMIN |
|
QUAN |
|
9 |
3 |
|
PLIFZ |
Planned Delivery Time in Days |
PLIFZ |
|
DEC |
|
3 |
0 |
|
DAUNO |
Normal duration of the activity |
DAUNOR |
|
QUAN |
|
5 |
1 |
|
DAUNE |
Normal duration/unit |
DAUNORE |
T006
|
UNIT |
|
3 |
0 |
|
DAUMI |
Minimum activity duration |
DAUMIN |
|
QUAN |
|
5 |
1 |
|
DAUME |
Unit for the minimum duration |
DAUMINE |
T006
|
UNIT |
|
3 |
0 |
|
EINSA |
Constraint on the basic start date for the activity |
EINSCHRA |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Must start on |
2 |
Cannot start before |
3 |
Cannot start later |
5 |
Start from resource planning |
|
EINSE |
Constraint on the finish date of the activity |
EINSCHRE |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Must finish on |
2 |
Cannot finish before |
3 |
Finish not later |
4 |
Finish from confirmation |
NULL |
|
|
ARBEI |
Work involved in the activity |
ARBEIT |
|
QUAN |
|
7 |
1 |
|
ARBEH |
Unit for work |
ARBEITE |
T006
|
UNIT |
|
3 |
0 |
|
MGVRG |
Operation Quantity |
MGVRG |
|
QUAN |
|
13 |
3 |
|
ASVRG |
Operation scrap |
ASVRG |
|
QUAN |
|
13 |
3 |
|
LMNGA |
Total Yield Confirmed |
LMNGA |
|
QUAN |
|
13 |
3 |
|
XMNGA |
Total scrap quantity confirmed |
XMNGA |
|
QUAN |
|
13 |
3 |
|
GMNGA |
Confirmed yield in order unit of measure |
GMNGA |
|
QUAN |
|
13 |
3 |
|
ISM01 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISM02 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISM03 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISM04 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISM05 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISM06 |
Previously confirmed activity |
CO_RUMNG |
|
QUAN |
|
13 |
3 |
|
ISMNW |
Actual work |
CO_ISMNW |
|
QUAN |
|
13 |
3 |
|
FSAVD |
Earliest scheduled start: Execution (date) |
FSAVD |
|
DATS |
|
8 |
0 |
|
FSAVZ |
Earliest scheduled start: Execution (time) |
FSAVZ |
|
TIMS |
|
6 |
0 |
|
FSSBD |
Earliest scheduled start: Processing (date) |
FSSBD |
|
DATS |
|
8 |
0 |
|
FSSBZ |
Earliest scheduled start: Processing (time) |
FSSBZ |
|
TIMS |
|
6 |
0 |
|
FSSAD |
Earliest scheduled start: Teardown (date) |
FSSAD |
|
DATS |
|
8 |
0 |
|
FSSAZ |
Earliest scheduled start: Teardown (time) |
FSSAZ |
|
TIMS |
|
6 |
0 |
|
FSEDD |
Earliest scheduled finish: Execution (date) |
FSEDD |
|
DATS |
|
8 |
0 |
|
FSEDZ |
Earliest scheduled finish: Execution (time) |
FSEDZ |
|
TIMS |
|
6 |
0 |
|
FSSLD |
Earliest scheduled start: Wait (date) |
FSSLD |
|
DATS |
|
8 |
0 |
|
FSSLZ |
Earliest scheduled start: Wait (time) |
FSSLZ |
|
TIMS |
|
6 |
0 |
|
FSELD |
Earliest scheduled finish: Wait (date) |
FSELD |
|
DATS |
|
8 |
0 |
|
FSELZ |
Earliest scheduled finish: Wait (time) |
FSELZ |
|
TIMS |
|
6 |
0 |
|
SSAVD |
Latest scheduled start: Execution (date) |
SSAVD |
|
DATS |
|
8 |
0 |
|
SSAVZ |
Latest scheduled start: Execution (time) |
SSAVZ |
|
TIMS |
|
6 |
0 |
|
SSSBD |
Latest scheduled start: Processing (date) |
SSSBD |
|
DATS |
|
8 |
0 |
|
SSSBZ |
Latest scheduled start: Processing (time) |
SSSBZ |
|
TIMS |
|
6 |
0 |
|
SSSAD |
Latest scheduled start: Teardown (date) |
SSSAD |
|
DATS |
|
8 |
0 |
|
SSSAZ |
Latest scheduled start: Teardown (time) |
SSSAZ |
|
TIMS |
|
6 |
0 |
|
SSEDD |
Latest scheduled finish: Execution (date) |
SSEDD |
|
DATS |
|
8 |
0 |
|
SSEDZ |
Latest scheduled finish: Execution (time) |
SSEDZ |
|
TIMS |
|
6 |
0 |
|
SSSLD |
Latest scheduled start: Wait time (date) |
SSSLD |
|
DATS |
|
8 |
0 |
|
SSSLZ |
Latest scheduled start: Wait time |
SSSLZ |
|
TIMS |
|
6 |
0 |
|
SSELD |
Latest scheduled finish: Wait time (date) |
SSELD |
|
DATS |
|
8 |
0 |
|
SSELZ |
Latest scheduled finish: Wait time |
SSELZ |
|
TIMS |
|
6 |
0 |
|
ISAVD |
Actual operation start (date) |
ISAVD |
|
DATS |
|
8 |
0 |
|
IEAVD |
Actual finish of operation (date) |
IEAVD |
|
DATS |
|
8 |
0 |
|
ISDD |
Actual start: Execution (date) |
ISDD |
|
DATS |
|
8 |
0 |
|
ISDZ |
Actual start: Execution/setup (time) |
ISDZ |
|
TIMS |
|
6 |
0 |
|
IERD |
Actual finish: Setup (date) |
IERD |
|
DATS |
|
8 |
0 |
|
IERZ |
Actual finish: Setup (time) |
IERZ |
|
TIMS |
|
6 |
0 |
|
ISBD |
Actual start: Processing (date) |
ISBD |
|
DATS |
|
8 |
0 |
|
ISBZ |
Actual start: Processing (time) |
ISBZ |
|
TIMS |
|
6 |
0 |
|
IEBD |
Actual finish: Processing (date) |
IEBD |
|
DATS |
|
8 |
0 |
|
IEBZ |
Actual processing finish (time) |
IEBZ |
|
TIMS |
|
6 |
0 |
|
ISAD |
Actual start: Teardown (date) |
ISAD |
|
DATS |
|
8 |
0 |
|
ISAZ |
Actual start: Teardown (time) |
ISAZ |
|
TIMS |
|
6 |
0 |
|
IEDD |
Actual finish: Execution (date) |
IEDD |
|
DATS |
|
8 |
0 |
|
IEDZ |
Actual finish: Execution (time) |
IEDZ |
|
TIMS |
|
6 |
0 |
|
PEDD |
Forecast finish date of operation from confirmation |
CO_PEDD |
|
DATS |
|
8 |
0 |
|
PEDZ |
Forecast finish time of operation from confirmation |
CO_PEDZ |
|
TIMS |
|
6 |
0 |
|
PUFFR |
Free float |
PUFFR_FREI |
|
DEC |
|
3 |
0 |
|
PUFGS |
Total float |
PUFFR_GESM |
|
DEC |
|
3 |
0 |
|
NTANF |
Constraint for activity start (Basic) |
VORGABESTD |
|
DATS |
|
8 |
0 |
|
NTANZ |
Constraint for activity start time (Basic) |
VORGABESTZ |
|
TIMS |
|
6 |
0 |
|
NTEND |
Constraint for Finish of Activity (Basic) |
VORGABEEND2 |
|
DATS |
|
8 |
0 |
|
NTENZ |
Basic finish time of the activity |
VORGABEENZ |
|
TIMS |
|
6 |
0 |
|
EWSTD |
Forecasted start date for the activity |
EWSTARTD |
|
DATS |
|
8 |
0 |
|
EWSTZ |
Forecast start time of the activity |
EWSTARTZ |
|
TIMS |
|
6 |
0 |
|
EWEND |
Forecast finish date |
EWENDED |
|
DATS |
|
8 |
0 |
|
EWENZ |
Forecast finish time for the activity |
EWENDEZ |
|
TIMS |
|
6 |
0 |
|
EWDAN |
Normal duration (from forecast) of activity |
EWDAN |
|
QUAN |
|
5 |
1 |
|
EWDNE |
Unit for forecast normal duration |
EWDNE |
T006
|
UNIT |
|
3 |
0 |
|
EWDAM |
Minimum duration (from forecast) for activity |
EWDAM |
|
QUAN |
|
5 |
1 |
|
EWDME |
Unit for forecast minimum duration |
EWDME |
T006
|
UNIT |
|
3 |
0 |
|
EWSTE |
Forecast date constraint on activity finish |
PS_RESTE |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Must finish on |
2 |
Cannot finish before |
3 |
Finish not later |
4 |
Finish from confirmation |
NULL |
|
|
EWSTA |
Forecast date constraint on activity start |
PS_RESTA |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Must start on |
2 |
Cannot start before |
3 |
Cannot start later |
5 |
Start from resource planning |
|
WARTZ |
Queue time used for scheduling |
WARTEZEIT |
|
FLTP |
|
16 |
16 |
|
WRTZE |
Unit of measure for queue time |
WTRZE |
|
UNIT |
|
3 |
0 |
|
RUEST |
Setup time |
RUEST |
|
FLTP |
|
16 |
16 |
|
RSTZE |
Unit of measure for setup time |
RSTZE |
|
UNIT |
|
3 |
0 |
|
BEARZ |
Processing time |
BEARZEIT |
|
FLTP |
|
16 |
16 |
|
BEAZE |
Unit of measure for processing time |
BEAZE |
|
UNIT |
|
3 |
0 |
|
ABRUE |
Teardown |
ABRUE |
|
FLTP |
|
16 |
16 |
|
ARUZE |
Unit of measure for teardown |
ARUZE |
|
UNIT |
|
3 |
0 |
|
LIEGZ |
Wait time used for scheduling |
LIEGEZEIT |
|
FLTP |
|
16 |
16 |
|
LIGZE |
Unit of measure for wait time |
LIGZE |
|
UNIT |
|
3 |
0 |
|
TRANZ |
Move time used for scheduling |
TRANSZEIT |
|
FLTP |
|
16 |
16 |
|
TRAZE |
Unit of measure for move time |
TRAZE |
|
UNIT |
|
3 |
0 |
|
ISERH |
Confirmed break time |
ISERH |
|
QUAN |
|
9 |
3 |
|
OFM01 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFM02 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFM03 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFM04 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFM05 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFM06 |
Forecast value used to update the standard value |
CO_SCHAETZ |
|
QUAN |
|
9 |
3 |
|
OFMNW |
Forecasted work (actual + remaining) |
OFMNW |
|
QUAN |
|
7 |
1 |
|
BZOFFB |
Reference date for start of sub-operation |
CP_OBZOFFB |
TCA54
|
CHAR |
|
2 |
0 |
|
EHOFFB |
Unit for offset to start |
CP_OEHOFFB |
T006
|
UNIT |
|
3 |
0 |
|
OFFSTB |
Offset to sub-operation start |
CP_OOFFSTB |
|
QUAN |
|
5 |
0 |
|
OFFSTE |
Offset to sub-operation finish |
CP_OOFFSTE |
|
QUAN |
|
5 |
0 |
|
BZOFFE |
Reference date for finish of sub-operation |
CP_OBZOFFE |
TCA54
|
CHAR |
|
2 |
0 |
|
EHOFFE |
Unit for offset to finish |
CP_OEHOFFE |
T006
|
UNIT |
|
3 |
0 |
|
FPAVD |
Earliest scheduled start date (forecast) |
FPAVD |
|
DATS |
|
8 |
0 |
|
FPAVZ |
Earliest scheduled start time (forecast) |
FPAVZ |
|
TIMS |
|
6 |
0 |
|
FPEDD |
Earliest scheduled finish date (forecast) |
FPEDD |
|
DATS |
|
8 |
0 |
|
FPEDZ |
Earliest scheduled finish time (forecast) |
FPEDZ |
|
TIMS |
|
6 |
0 |
|
SPAVD |
Latest scheduled start date (forecast) |
SPAVD |
|
DATS |
|
8 |
0 |
|
SPAVZ |
Latest scheduled start time (forecast) |
SPAVZ |
|
TIMS |
|
6 |
0 |
|
SPEDD |
Latest scheduled finish date (forecast) |
SPEDD |
|
DATS |
|
8 |
0 |
|
SPEDZ |
Latest scheduled finish time (forecast) |
SPEDZ |
|
TIMS |
|
6 |
0 |
|
BEAZP |
Unit of processing time (Forecast) |
BEAZEP |
|
UNIT |
|
3 |
0 |
|
PUFGP |
Total float (from forecast) |
PPUFF_GESM |
|
DEC |
|
3 |
0 |
|
PUFFP |
Free float (from forecast) |
PPUFF_FREI |
|
DEC |
|
3 |
0 |
|
BEARP |
Processing time (forecast) |
PBEARZEIT |
|
FLTP |
|
16 |
16 |
|
EPANF |
Dispatched start date for operation |
EPANF |
|
DATS |
|
8 |
0 |
|
EPANZ |
Dispatched start time for operation |
EPANZ |
|
TIMS |
|
6 |
0 |
|
EPEND |
Dispatched finish date |
EPEND |
|
DATS |
|
8 |
0 |
|
EPENZ |
Dispatched finish time |
EPENZ |
|
TIMS |
|
6 |
0 |
|
PDAU |
Forecasted duration of activity from confirmation |
PDAU |
|
QUAN |
|
5 |
1 |
|
PDAE |
Unit of the forecasted duration from the confirmation |
PDAE |
T006
|
UNIT |
|
3 |
0 |
|
KNOTE |
Transportation Connection Points |
KNOTE |
TVKN
|
CHAR |
|
10 |
0 |
|
VSTZW |
Deadline function |
VSTZW |
TVTZ
|
CHAR |
|
4 |
0 |
|
VSTGA |
Deadline deviation reason |
VSTGA |
TVTG
|
CHAR |
|
4 |
0 |
|
QRASTZEHT |
Time Unit |
QRASTZEHT |
|
UNIT |
|
3 |
0 |
|
QRASTZFAK |
Time Factor |
QRASTZFAK |
|
DEC |
|
5 |
2 |
|
QRASTMENG |
Quantity Between Two Inspections |
QRASTMENG |
|
QUAN |
|
13 |
3 |
|
QRASTEREH |
Grid Unit of Measure |
QRASTEREH |
|
UNIT |
|
3 |
0 |
|
AUFKT |
Execution Factor |
AFAKT |
|
DEC |
|
3 |
0 |
|
RMNGA |
Total confirmed rework quantity |
RMNGA |
|
QUAN |
|
13 |
3 |
|
ILE01 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
ILE02 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
ILE03 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
ILE04 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
ILE05 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
ILE06 |
Unit of measure for the activity to be confirmed |
CO_ISMNGEH |
|
UNIT |
|
3 |
0 |
|
RWFAK |
Rework factor (is not used yet) |
RWFAK |
|
DEC |
|
5 |
3 |
|
IPRZ1 |
Confirmed quantity/work for business process |
CO_IPRZS |
|
QUAN |
|
13 |
3 |
|
IPRE1 |
Unit of measurement for conf. quantity for business process |
RU_IPRZE |
|
UNIT |
|
3 |
0 |
|
IPRK1 |
No remaining quantity expected for business process |
RU_IPRZK |
|
CHAR |
|
1 |
0 |
Possible values
|
TAKT |
takt within a line segment |
LD_TAKT |
|
NUMC |
|
4 |
0 |
|
OPRZ1 |
Remaining quantity for business process |
OPRZ1 |
|
QUAN |
|
13 |
3 |
|
OPRE1 |
Unit for remaining quantity of business process |
OPRE1 |
|
UNIT |
|
3 |
0 |
|
PSPM_INDICATOR |
Indicates PMCS date influence activity scheduling |
PSPM_INDICATOR |
|
CHAR |
|
1 |
0 |
|