MANDT |
Client |
MANDT |
|
CLNT |
|
3 |
0 |
|
KALAID |
Name of Costing Run |
CK_KALAID |
|
CHAR |
|
8 |
0 |
|
KALADAT |
Costing Run Date |
CK_KALADAT |
|
DATS |
|
8 |
0 |
|
TVERS |
Costing Version |
CK_TVERS |
|
NUMC |
|
2 |
0 |
|
DISST |
Low-Level Code |
DISST |
|
CHAR |
|
3 |
0 |
|
KALVZAE |
Numerator for Costing Run Tables (KAL*) |
CK_KALVZAE |
|
INT4 |
|
10 |
0 |
|
SELKZ |
Checkbox |
XFELD |
|
CHAR |
|
1 |
0 |
Possible values
|
WERKS |
Plant |
WERKS_D |
T001W
|
CHAR |
|
4 |
0 |
|
VBELN |
Sales and Distribution Document Number |
VBELN |
|
CHAR |
|
10 |
0 |
|
POSNR |
Item number of the SD document |
POSNR |
|
NUMC |
|
6 |
0 |
|
MATNR |
Material Number |
MATNR |
MARA
|
CHAR |
|
18 |
0 |
|
VERID |
Production Version |
VERID |
|
CHAR |
|
4 |
0 |
|
STLAN |
BOM Usage |
STLAN |
T416
|
CHAR |
|
1 |
0 |
|
STNUM |
Bill of material |
STNUM |
|
CHAR |
|
8 |
0 |
|
STALT |
Alternative BOM |
STALT |
|
CHAR |
|
2 |
0 |
|
PLNTY |
Task List Type |
PLNTY |
TCA01
|
CHAR |
|
1 |
0 |
|
PLNNR |
Key for Task List Group |
PLNNR |
|
CHAR |
|
8 |
0 |
|
PLNAL |
Group Counter |
PLNAL |
|
CHAR |
|
2 |
0 |
|
PLNCT |
Internal counter |
CIM_COUNT |
|
NUMC |
|
8 |
0 |
|
LOSGR |
Planned lot size |
LOSGR |
|
QUAN |
|
13 |
3 |
|
SUMLO |
Planned lot size |
LOSGR |
|
QUAN |
|
13 |
3 |
|
MEINS |
Base Unit of Measure |
MEINS |
T006
|
UNIT |
|
3 |
0 |
|
KADAT |
Date |
DATUM |
|
DATS |
|
8 |
0 |
|
ROHSTOFF |
Material Component |
CK_ROH |
|
CHAR |
|
1 |
0 |
Possible values
|
SUMMENSATZ |
Checkbox |
XFELD |
|
CHAR |
|
1 |
0 |
Possible values
|
BIDAT |
Costing Date To |
CK_BIDAT |
|
DATS |
|
8 |
0 |
|
ALDAT |
Quantity Structure Date for Costing |
CK_BRDAT |
|
DATS |
|
8 |
0 |
|
BEDAT |
Requirements Date |
CK_BEDAT |
|
DATS |
|
8 |
0 |
|
BWDAT |
Valuation Date of a Cost Estimate |
CK_BWDAT |
|
DATS |
|
8 |
0 |
|
FEH_A_ANZ |
No. System Messages in Selection/Qty Structure Determination |
CK_FEH_ANZ |
|
INT4 |
|
10 |
0 |
|
FEH_K_ANZ |
Number of System Messages in Costing |
CK_FEH_ANK |
|
INT4 |
|
10 |
0 |
|
FEH_STATUS |
Costing Status |
CK_FEH_STA |
|
CHAR |
|
2 |
0 |
Possible values
ER |
Opened |
SE |
Selected Without Errors |
SF |
Selected with Errors |
KA |
Costed Without Errors |
KF |
Costed with Errors |
VO |
Marked Without Errors |
VF |
Marked with Errors |
FR |
Released Without Errors |
FF |
Released with Errors |
FM |
Release Through Material Ledger Settlement |
|
KALNR |
Cost Estimate Number - Product Costing |
CK_KALNR1 |
|
NUMC |
|
12 |
0 |
|
BWTAR |
Valuation Type |
BWTAR_D |
|
CHAR |
|
10 |
0 |
|
ERFNM |
Entered by |
ERFNM |
|
CHAR |
|
12 |
0 |
|
DISPO |
MRP Controller (Materials Planner) |
DISPO |
T024D
|
CHAR |
|
3 |
0 |
|
EKGRP |
Purchasing Group |
EKGRP |
T024
|
CHAR |
|
3 |
0 |
|
LABOR |
Laboratory/design office |
LABOR |
T024L
|
CHAR |
|
3 |
0 |
|
VAGRP |
Responsible planner group/department |
VAGRP |
T024A
|
CHAR |
|
3 |
0 |
|
SOBSL |
Special Procurement Key for the Costing Object |
CK_SOBSK |
T460A
|
CHAR |
|
2 |
0 |
|
SOWRK |
Special Procurement Plant - Costing |
CK_SOWRK |
|
CHAR |
|
4 |
0 |
|
KOSGR |
Costing Overhead Group |
CK_KOSGR |
|
CHAR |
|
10 |
0 |
|
ZSCHL |
Costing Overhead Key |
CK_ZSCHL |
|
CHAR |
|
6 |
0 |
|
FEH_STATUF |
Costing Status for Marked/Released Objects |
CK_FEH_STF |
|
CHAR |
|
2 |
0 |
Possible values
ER |
Opened |
SE |
Selected Without Errors |
SF |
Selected with Errors |
KA |
Costed Without Errors |
KF |
Costed with Errors |
VO |
Marked Without Errors |
VF |
Marked with Errors |
FR |
Released Without Errors |
FF |
Released with Errors |
FM |
Release Through Material Ledger Settlement |
|
LOSAU |
Lot Size Taking Scrap into Account |
CK_LOSAU |
|
QUAN |
|
13 |
3 |
|
CUOBJ |
Object Number for Conf. Objects |
CK_CUOBJ |
|
NUMC |
|
18 |
0 |
|
CUOBJID |
Indicator for Configurable Objects |
CK_CUOBJID |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Configured Material (Variant) |
2 |
Configurable Material |
|
TYPE |
Configured Material (Variant) |
CK_TYPE |
MARA
|
CHAR |
|
18 |
0 |
|
PROZESS |
Process Through Which Co-Product Was Costed |
CK_PROZESS |
|
CHAR |
|
18 |
0 |
|
KZKUP |
Indicator: Material can be co-product |
KZKUPMAT |
|
CHAR |
|
1 |
0 |
Possible values
X |
Flag set. Event has occurred. |
NULL |
Flag is Not Set |
|
PR_LOSGR |
Planned lot size |
LOSGR |
|
QUAN |
|
13 |
3 |
|
PR_SUMLO |
Planned lot size |
LOSGR |
|
QUAN |
|
13 |
3 |
|
PR_LOSAU |
Lot Size Taking Scrap into Account |
CK_LOSAU |
|
QUAN |
|
13 |
3 |
|
PR_MEINS |
Base Unit of Measure |
MEINS |
T006
|
UNIT |
|
3 |
0 |
|
PR_VERID |
Production Version To Be Costed |
CK_VERID |
MKAL
|
CHAR |
|
4 |
0 |
|
STVFIX |
Checkbox |
XFELD |
|
CHAR |
|
1 |
0 |
Possible values
|
SBDKZ |
Dependent requirements ind. for individual and coll. reqmts |
SBDKZ |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Individual and collective requirements |
1 |
Individual requirements only |
2 |
Collective requirements only |
|
ALTSL |
Method for Selecting Alternative Bills of Material |
ALTSL |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Selection by order quant. |
1 |
Selection by explosion date |
2 |
Selection by production version |
3 |
Selection only by production version |
|
MLMAA |
Material ledger activated at material level |
CK_ML_MAAC |
|
CHAR |
|
1 |
0 |
Possible values
|
BESKZ |
Procurement Type |
BESKZ |
|
CHAR |
|
1 |
0 |
Possible values
E |
In-house production |
F |
External procurement |
NULL |
No procurement |
X |
Both procurement types |
|
AUSSS |
Assembly scrap in percent |
AUSSS |
|
DEC |
|
5 |
2 |
|
PRCTR |
Profit Center |
PRCTR |
|
CHAR |
|
10 |
0 |
|
SPART |
Division |
SPART |
|
CHAR |
|
2 |
0 |
|
MTART |
Material Type |
MTART |
T134
|
CHAR |
|
4 |
0 |
|