| MANDT |
Client |
MANDT |
|
CLNT |
|
3 |
0 |
|
| DTART |
Type of MRP list |
DTART |
|
CHAR |
|
2 |
0 |
Possible values
| MD |
Material requirements planning |
| LP |
Long-Term Planning |
|
| MATNR |
Material Number |
MATNR |
MARA
|
CHAR |
|
18 |
0 |
|
| BERID |
MRP Area |
BERID |
MDLV
|
CHAR |
|
10 |
0 |
|
| PLSCN |
Planning Scenario of Long-Term Planning |
PLSCN |
PLSC
|
NUMC |
|
3 |
0 |
|
| PLWRK |
MRP area: Plant |
WERKDP |
|
CHAR |
|
4 |
0 |
|
| DTNUM |
Number of material requirements planning table |
DTNUM |
|
NUMC |
|
10 |
0 |
|
| DSDAT |
MRP date |
DSDAT |
|
DATS |
|
8 |
0 |
|
| BDBKZ |
Selection indicator for processed MRP lists |
BDBKZ |
|
CHAR |
|
1 |
0 |
Possible values
|
| SLKZ1 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ2 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ3 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ4 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ5 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ6 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ7 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| SLKZ8 |
Selection indicator for exception groups |
SLKZX |
|
CHAR |
|
1 |
0 |
|
| VRKZ1 |
Processing indicator 01 |
VRKZ1 |
|
CHAR |
|
1 |
0 |
Possible values
|
| VRKZ2 |
Processing indicator 02 |
VRKZ2 |
|
CHAR |
|
1 |
0 |
Possible values
|
| VRKZ3 |
Processing indicator - 03 |
VRKZ3 |
|
CHAR |
|
1 |
0 |
Possible values
|
| MTART |
Material Type |
MTART |
T134
|
CHAR |
|
4 |
0 |
|
| MEINS |
Base Unit of Measure |
MEINS |
T006
|
UNIT |
|
3 |
0 |
|
| DISST |
Low-Level Code |
DISST |
|
CHAR |
|
3 |
0 |
|
| BESKZ |
Procurement Type |
BESKZ |
|
CHAR |
|
1 |
0 |
Possible values
| E |
In-house production |
| F |
External procurement |
| NULL |
No procurement |
| X |
Both procurement types |
|
| SOBSL |
Special procurement type |
SOBSL |
T460A
|
CHAR |
|
2 |
0 |
|
| SOBES |
Special procurement type |
SOBES |
|
CHAR |
|
1 |
0 |
Possible values
| 0 |
Standard external procurement |
| 2 |
Consignment |
| 3 |
Subcontracting |
| 7 |
Stock transfer |
| E |
Standard in-house production |
| P |
Production in plant 2 |
| 9 |
IS-OIL only: Stock transfer reservation |
|
| WRK02 |
Planning/production plant |
WRK02 |
T001W
|
CHAR |
|
4 |
0 |
|
| DISMM |
MRP Type |
DISMM |
T438A
|
CHAR |
|
2 |
0 |
|
| DISVF |
MRP procedure |
DISVF |
|
CHAR |
|
1 |
0 |
Possible values
| B |
Reorder point planning |
| D |
Material requirements planning |
| N |
No MRP |
| S |
Forecast-based planning |
| M |
Master production scheduling |
| R |
Time-phased materials planning |
| W |
Replenishment (IS Retail) |
| X |
Without MRP, with BOM explosion |
|
| DISPO |
MRP Controller (Materials Planner) |
DISPO |
T024D
|
CHAR |
|
3 |
0 |
|
| PLDIS |
Planning controller (no longer used) |
PLDIS |
T024D
|
CHAR |
|
3 |
0 |
|
| EKGRP |
Purchasing Group |
EKGRP |
T024
|
CHAR |
|
3 |
0 |
|
| MTWZT |
Material replenishment lead time |
MTWZT |
|
DEC |
|
3 |
0 |
|
| WEBAZ |
Goods Receipt Processing Time in Days |
WEBAZ |
|
DEC |
|
3 |
0 |
|
| BEAZT |
Processing time for purchase order proposal |
BEAZT |
|
DEC |
|
3 |
0 |
|
| FIXTR |
End of planning time fence (date) |
FIXTR |
|
DATS |
|
8 |
0 |
|
| MFHKZ |
Planning time fence set manually (MFXDT) |
MFHKZ |
|
CHAR |
|
1 |
0 |
Possible values
|
| DISLS |
Lot size (materials planning) |
DISLS |
T439A
|
CHAR |
|
2 |
0 |
|
| LOSVF |
Lot-sizing procedure for short-term period |
LOSVF |
|
CHAR |
|
1 |
0 |
Possible values
| S |
Static lot-sizing procedure |
| P |
Period lot-sizing procedure |
| O |
Optimum lot-sizing procedure |
|
| LOSKZ |
Lot-size indicator for the short-term period |
LOSKZ |
|
CHAR |
|
1 |
0 |
Possible values
| W |
Period lot size: weekly lot/dyn. lot-sizing: least unit cost |
| F |
Fixed lot size |
| E |
Lot-for-lot order quantity |
| H |
Replenish to maximum stock level |
| T |
Daily lot size |
| M |
Monthly lot size |
| P |
Period lot sizes according to posting periods |
| D |
Dynamic lot size creation |
| G |
Groff reorder procedure |
| S |
Stat.lot size: fixed w. splitting/dyn.lot size: part pd bal. |
| K |
Period lot size as in PPC planning calendar |
|
| PERAZ |
Number of periods for the short-term area |
PERAZ |
|
DEC |
|
3 |
0 |
|
| EISBE |
Safety Stock |
EISBE |
|
QUAN |
|
13 |
3 |
|
| MINBE |
Reorder Point |
MINBE |
|
QUAN |
|
13 |
3 |
|
| HOEBE |
Maximum stock level |
MABST |
|
QUAN |
|
13 |
3 |
|
| BSTMI |
Minimum Lot Size |
BSTMI |
|
QUAN |
|
13 |
3 |
|
| BSTMA |
Maximum Lot Size |
BSTMA |
|
QUAN |
|
13 |
3 |
|
| BSTFX |
Fixed lot size |
BSTFE |
|
QUAN |
|
13 |
3 |
|
| BSTRF |
Rounding value for purchase order quantity |
BSTRF |
|
QUAN |
|
13 |
3 |
|
| SUM01 |
Plant stock / only plant segment |
SUM01W |
|
QUAN |
|
13 |
3 |
|
| SUM02 |
No longer used/do not use!! |
NOUSE |
|
QUAN |
|
13 |
3 |
|
| SUM03 |
No longer used/do not use!! |
NOUSE |
|
QUAN |
|
13 |
3 |
|
| SUM04 |
No longer used/do not use!! |
NOUSE |
|
QUAN |
|
13 |
3 |
|
| SUM05 |
No longer used/do not use!! |
NOUSE |
|
QUAN |
|
13 |
3 |
|
| NEGBS |
Negative stock |
NEGBS |
|
QUAN |
|
13 |
3 |
|
| MSGID |
Message identification |
MSGID |
|
CHAR |
|
20 |
0 |
|
| MSGAR |
Message Type |
MSGTY |
|
CHAR |
|
1 |
0 |
Possible values
| S |
Message on next screen |
| I |
Information |
| A |
Cancel |
| E |
Error |
| W |
Warning |
|
| MSGNR |
Message number |
MSGNR |
T100
|
CHAR |
|
3 |
0 |
|
| MSGV1 |
Message variable 01 |
MSGV1 |
|
CHAR |
|
50 |
0 |
|
| MSGV2 |
Message variable 02 |
MSGV2 |
|
CHAR |
|
50 |
0 |
|
| MSGV3 |
Message variable 03 |
MSGV3 |
|
CHAR |
|
50 |
0 |
|
| MSGV4 |
Message variable 04 |
MSGV4 |
|
CHAR |
|
50 |
0 |
|
| DISGR |
MRP Group |
DISGR |
T438M
|
CHAR |
|
4 |
0 |
|
| PERIV |
Fiscal Year Variant |
PERIV |
T009
|
CHAR |
|
2 |
0 |
|
| MRPPP |
PPC planning calendar |
MRPPP |
T439G
|
CHAR |
|
3 |
0 |
|
| BDARF |
Requirements quantity from material requirements planning |
BDARF |
|
QUAN |
|
13 |
3 |
|
| LFRHY |
Planning cycle |
LFRHY |
T439G
|
CHAR |
|
3 |
0 |
|
| RDPRF |
Rounding Profile |
RDPRF |
|
CHAR |
|
4 |
0 |
|
| BERW1 |
Stock Days' Supply Without Receipts |
BERW1 |
|
DEC |
|
4 |
1 |
|
| BERW2 |
First Receipt Days' Supply |
BERW2 |
|
DEC |
|
4 |
1 |
|
| KZAUS |
Discontinuation indicator |
KZAUS |
|
CHAR |
|
1 |
0 |
Possible values
| 1 |
Single/parallel discontinued part/material |
| 3 |
Dependent parallel discontinued part/material |
|
| AUSDT |
Effective-Out Date |
AUSDT |
|
DATS |
|
8 |
0 |
|
| NFMAT |
Follow-Up Material |
NFMAT |
|
CHAR |
|
18 |
0 |
|
| AUSZ1 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ2 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ3 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ4 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ5 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ6 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ7 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| AUSZ8 |
Exception group in the MRP list |
AUSZX |
|
CHAR |
|
2 |
0 |
|
| BEADA |
MRP list processing date |
BEADA |
|
DATS |
|
8 |
0 |
|
| NAUKZ |
Indicator: new exception in the MRP list |
NAUKZ |
|
CHAR |
|
1 |
0 |
|
| SAUFT |
Ind.: Repetitive mfg allowed |
SA_SAUFT |
|
CHAR |
|
1 |
0 |
Possible values
|
| KZPROMO |
Indicator: Material in promotion |
KZPROMO |
|
CHAR |
|
1 |
0 |
|
| SHFLG |
Safety time indicator (with or without safety time) |
SHFLG |
|
CHAR |
|
1 |
0 |
Possible values
| NULL |
Ignore safety time |
| 1 |
Safety time for independent reqmts |
| 2 |
Safety time for all requirements |
|
| SHZET |
Safety time (in workdays) |
SHZET |
|
NUMC |
|
2 |
0 |
|
| FABKZ |
Indicator: Item Relevant to JIT Delivery Schedules |
FABKZ |
|
CHAR |
|
1 |
0 |
Possible values
| NULL |
No JIT |
| 1 |
Automatically |
|
| MFXDT |
Manual firming date |
MFXDT |
|
DATS |
|
8 |
0 |
|
| BSKFL |
Flag whether stock correction factors exist |
BSKFL |
|
CHAR |
|
1 |
0 |
Possible values
| NULL |
Blank |
| . |
Radio button |
| X |
Selection |
|
| MAABC |
ABC Indicator |
MAABC |
|
CHAR |
|
1 |
0 |
|
| CFLAG |
Aggregated MRP list |
COMPMRPL |
|
CHAR |
|
1 |
0 |
Possible values
|
| GRREL |
Relevant for requirements grouping for project stock |
GRREL |
|
CHAR |
|
1 |
0 |
Possible values
|
| RWPRO |
Range of coverage profile |
RWPRO |
|
CHAR |
|
3 |
0 |
|
| SHPRO |
Period Profile for Safety Time |
SHPRO |
|
CHAR |
|
3 |
0 |
|
| AHDIS |
MRP relevancy for dependent requirements |
AHDIS |
|
CHAR |
|
1 |
0 |
Possible values
| NULL |
Materials for dependent requirements are planned |
| 1 |
Materials for dependent requirements are not planned |
|
| BERW4 |
Second Receipt Days' Supply |
BERW4 |
|
DEC |
|
4 |
1 |
|
| BADON |
Indicator: BAdI is Active |
MD_BADI_ON |
|
CHAR |
|
1 |
0 |
Possible values
|
| HANAON |
HANA Optimizations Active / Inactive |
PPH_HANA_ON |
|
CHAR |
|
1 |
0 |
Possible values
|