CL |
Material Ledger Settlement |
UP |
Material Ledger Update |
PC |
Price Change |
DC |
Debit/Credit Material |
ST |
Single-Level Price Determination |
MS |
Multilevel Price Determination |
MI |
Input Material (Multilevel Price Determination) |
MO |
Output Material (Multilevel Price Determination) |
MB |
Beginning Inventory (Multilevel Price Determination) |
MC |
Input Material: Currency Types Of Outputs (Multilvl Pr.Det.) |
RE |
Material Ledger Repair |
AT |
ML Update - Activity Consumption |
AC |
Input-Activity Type/ABC Process (Multilevel Pr. Determ.) |
CC |
Alternatice Valuation Run Closing |
RC |
Revaluation of Consumption |
RO |
Revaluation of Consumption to Original Account Assignment |
RS |
Revaluation of Consumption to Collective Account Assignment |
MA |
Manual Change of Actual Cost Component Splits |
OC |
New Valuation Logical Inventory (Only IS-Oil) |
WC |
WIP: Input Material: Currency Type Output |
WI |
WIP: Input Material (Multilevel Price Determination) |
WL |
WIP: Input Activity Type/ABC Process (Multilevel) |
WP |
WIP Revaluation |
WQ |
WIP Quantity Document (WIP Determination) |
W1 |
Material (Total WIP Revaluation) |
W2 |
Material (Process WIP Revaluation) |
W3 |
Activity Type (Total WIP Revaluation) |
W4 |
Activity Type (Process WIP Revaluation) |
AL |
Activity Type/ABC Process Closing |
MY |
Delta Posting Balance Sheet Valuation |