SAP Table RCWBT

Screen Table for SAPLCJTR Module Pool

RCWBT (Screen Table for SAPLCJTR Module Pool) is a standard table in SAP R\3 ERP systems. Below you can find the technical details of the fields that make up this table. Key fields are marked in blue.

Additionally we provide an overview of foreign key relationships, if any, that link RCWBT to other SAP tables.

RCWBT table fields

Field Data element Checktable Datatype Length Decimals
POSID Identification of project element PS_OBJCT CHAR 24 0
POST1 PS: Short description (1st text line) PS_POST1 CHAR 40 0
POSKI WBS element short identification PS_POSKI CHAR 16 0
PSTRT WBS element: Basic start date PS_PSTRT DATS 8 0
PENDE WBS element: Basic finish date PS_PENDE DATS 8 0
PDAUR Scheduled duration of a WBS element PS_TRMDAUR QUAN 5 1
PEINH Normal duration/unit DAUNORE UNIT 3 0
ESTRT Forecasted start date of the WBS element PS_ESTRT DATS 8 0
EENDE Forecasted finish date of the WBS element PS_EENDE DATS 8 0
EDAUR Scheduled duration of a WBS element PS_TRMDAUR QUAN 5 1
EEINH Normal duration/unit DAUNORE UNIT 3 0
ISTRT Actual start date for the WBS element PS_ISTRT DATS 8 0
IENDE Actual finish date of the WBS element PS_IENDE DATS 8 0
IDAUR Scheduled duration of a WBS element PS_TRMDAUR QUAN 5 1
IEINH Normal duration/unit DAUNORE UNIT 3 0
STERM Start date for an object (WBS element, operation) PS_STERM DATS 8 0
ETERM Finish date for an object (WBS element, activity ...) PS_ETERM DATS 8 0
DAUER Length (duration) of a project or a WBS element PSDAUER QUAN 5 1
EINHT Normal duration/unit DAUNORE UNIT 3 0
STUFE Level in Project Hierarchy PS_STUFE INT1 3 0
SELKZ Selection flag SELKZ CHAR 1 0
NULL Not selected
* Selected and processed
X Selected but not yet processed
SLHIE Indicator: Assignments/Attributes WBS elements + activities PS_EIGEN CHAR 1 0
X Yes
NULL No
IDENT Work breakdown structure element (WBS element) PS_IDENT CHAR 40 0
LFDNR Entry ENTRY_ACT INT4 10 0
PLART Planning type for project date definition PSPLART NUMC 1 0
1 Planning of basic dates
2 Planning of forecast dates
PLFRM Planning method for project scheduling PSPLFRM NUMC 1 0
1 Top-down
2 Bottom-up (taking dates of higher-level WBS into account)
3 Open planning
4 Strict bottom-up (without dates of higher-level WBS)
AUFNR Order Number AUFNR CHAR 12 0
MSTRT Earliest start for the WBS element PS_MSTRT DATS 8 0
MENDE Latest finish for WBS element PS_MENDE DATS 8 0
PIDEN Project definition PS_PIDENT CHAR 40 0
UNTRG Indicator: WBS element is sub-divided PS_UNTRGIC CHAR 40 0
OBJCT Identification of project element PS_OBJCT CHAR 24 0
KENNR Object PS_KENNR CHAR 10 0
INCLA Create project with activities PS_INCLA CHAR 1 0
NULL Not selected
* Selected and processed
X Selected but not yet processed
VRGNG Indicator: Activities exist for WBS element PS_KZVRG CHAR 1 0
NTER Indicator: WBS dates are not current PS_NTER CHAR 1 0
NULL Not selected
* Selected and processed
X Selected but not yet processed
DIFFS Difference between scheduled start and entered start PS_DIFFS QUAN 5 1
DIFSE Normal duration/unit DAUNORE UNIT 3 0
DIFFE Difference between two finish dates PS_DIFFE QUAN 5 1
DIFEE Normal duration/unit DAUNORE UNIT 3 0
IRUCK Ind: Actual finish date can be entered for WBS element PS_PSPRUCK CHAR 1 0
NULL Not selected
* Selected and processed
X Selected but not yet processed
CORPD Report CFREPID2 CHAR 12 0
REPID Set ID SETNR CHAR 12 0
BELAS Capacity load caused by WBS element PS_BELASTG DEC 10 2
PSPPR Load (%) in one period caused by WBS elements PS_BELPROZ DEC 10 2
TRMRP Overview of Project Info System PS_TRMRP TCNE CHAR 30 0
TRMPRF Information system profile: Overview PS_PROF_DT TCND CHAR 12 0
BEZEI Description project objects PS_BEZEICH CHAR 40 0
VSNMR Number or description of a version VSNMR CHAR 12 0
SEARCH Search term PS_SEARCH CHAR 40 0
VSPOSID Work Breakdown Structure Element (WBS Element) PS_POSID CHAR 24 0
VSPSPID Project Definition PS_PSPID CHAR 24 0
VSKAT Project version category: status/time-dependent VSKAT CHAR 1 0
1 Status-dependent
2 Time-dependent
3 Simulation
4 Simulation production order
5 Simulation of configuration change for networks
VRGNG_IC Indicator: WBS element has activities assigned PS_VRGNGIC CHAR 40 0
FSAVD Earliest scheduled start: Execution (date) FSAVD DATS 8 0
FSEDD Earliest scheduled finish: Execution (date) FSEDD DATS 8 0
SSAVD Latest scheduled start: Execution (date) SSAVD DATS 8 0
SSEDD Latest scheduled finish: Execution (date) SSEDD DATS 8 0
FPAVD Earliest scheduled start date (forecast) FPAVD DATS 8 0
FPEDD Earliest scheduled finish date (forecast) FPEDD DATS 8 0
SPAVD Latest scheduled start date (forecast) SPAVD DATS 8 0
SPEDD Latest scheduled finish date (forecast) SPEDD DATS 8 0
VISTR Tentative actual start date for WBS element PS_ISTVORL DATS 8 0
VIEND Tentative actual finish date for WBS element PS_IENVORL DATS 8 0
SCHED_INST Schedule maintenance/service orders CN_SCHINST NUMC 1 0
1 Only maintenance and service orders
2 Only networks
3 Networks and maintenance/service orders

RCWBT foreign key relationships

Table Field Foreign key table Foreign key field Check table Check field
RCWBT TRMPRF SYST MANDT TCND Project Info System: Overview Settings MANDT
RCWBT TRMPRF RCWBT TRMRP TCND Project Info System: Overview Settings TABNAME
RCWBT TRMPRF RCWBT TRMPRF TCND Project Info System: Overview Settings PROFID
RCWBT TRMRP RCWBT TRMRP TCNE PS Info System: Object Table for Reporting Structures TABNAME