SAP Table RFICOS_CALC

Structure for Calculation Date

RFICOS_CALC (Structure for Calculation Date) is a standard table in SAP R\3 ERP systems. Below you can find the technical details of the fields that make up this table. Key fields are marked in blue.

Additionally we provide an overview of foreign key relationships, if any, that link RFICOS_CALC to other SAP tables.

RFICOS_CALC table fields

Field Data element Checktable Datatype Length Decimals
SVMETH Method for determining the next value date VVSVMETH NUMC 1 0
1 Regularly with fixed dates
2 Regularly with fixed periods
3 Relative to Due Date Before Working Day Shift
4 Relative to Due Date after Working Day Shift
5 Regularly, annually
6 Relative to start of period
7 Relative to each reference interest rate entry
SVWERK Shift calculation date to working day VVSVWERK NUMC 1 0
0 No shift
1 Next Working Day
2 Next Working Day Modified
3 Previous Working Day
4 Previous Working Day Modified
5 Next Working Day in Same Calendar Year
6 Previous Working Day in Same Calendar Year
SZEITANT Indicator for Pro Rata Temporis Calculations VVSZEITANT NUMC 1 0
0 Pro rate calculation in shortened/extended periods
1 No consideration taken in shortened/extended periods
2 Full consideration taken in shortened/extended periods
3 Start period: pro rate; End period: no consideration taken
4 Start period: pro rate; End period: full consideration taken
5 Start period: No consideration; End period: Pro rata
6 Start period: Full consideration; End period: Pro rata
7 Start period: No consideration; End period: full considerat.
8 Start period: Full consideration; End period: no considerat.
AVGSTAGE Number of working days for value date AVGSTAGE NUMC 2 0
AVGSTAGEVZ +/- sign for number of working days for value date AVGSTAGEVZ CHAR 1 0
+ Plus sign
- Minus sign
SINCL Inclusive indicator for beginning and end of a period VVSINCL NUMC 1 0
0 Start date inclusive/end date exclusive
1 Start date exclusive/end date inclusive
SVULT Month-end indicator for calculation date VVSBULT CHAR 1 0
NULL No
X Yes
JSOFVERR Immediate settlement JSOFVERR CHAR 1 0
NULL Settlement According to Condition
X Immediate Settlement
Y Settlement on Due Date
Z Settlement on Calculation Date
P Settlement at End of Period
E Clearing on Calculation Date (Interest Calc. Capital Only)