RPM_TS_PROJECT_INT table fields

Field Data element Checktable Datatype Length Decimals
GUID Guid for application objects RPM_TV_GUID RAW 16 0
EXTERNAL_ID ID RPM_TV_EXTID CHAR 24 0
CGPL_PROJECT CGPL_ATTR_INCL STRU 0 0
PROJECT_GUID Project Planning: 16 Character GUID for Projects CGPL_PROJECT_GUID RAW 16 0
OBJECT_TYPE Object Type in Project Planning CGPL_OBJECT_TYPE CHAR 3 0
PRIORITY Priority CGPL_PRIORITY NUMC 3 0
ACTUALSTART Actual Start Date CGPL_ACTUALSTART DEC 15 0
ACTUALFINISH Actual Finish Date CGPL_ACTUALFINISH DEC 15 0
PLANSTART Planned start date CGPL_PLANSTART DEC 15 0
PLANFINISH Planned Finish Date CGPL_PLANFINISH DEC 15 0
COMPLETION Percentage of Completion CGPL_COMPLETION NUMC 3 0
000 0 - 100
MILESTONE Milestone indicator CGPL_MILESTONE CHAR 1 0
CONSTRAINT_TYPE Type of Scheduling Constraint CGPL_CONSTRAINT CHAR 1 0
0 Earliest possible
1 Latest possible
2 Must start on
3 Must finish on
4 Start no earlier than
5 Start no later than
6 Finish no earlier than
7 Finish no later than
CONSTRAINT_TIME Constraint Date CGPL_CONSTRAINT_TIME DEC 15 0
CREATED_BY Name of Person Who Created Object CGPL_CREATED_BY CHAR 12 0
CREATED_ON Date When the Object Was Created CGPL_CREATED_ON DATS 8 0
CREATED_IN_BW Transfer Object to BW CGPL_CREATED_BW CHAR 1 0
CHANGED_BY Name of Person Who Changed Object CGPL_CHANGED_BY CHAR 12 0
CHANGED_ON Date on which object was last changed CGPL_CHANGED_ON DATS 8 0
UPDATED_IN_BW Current Object in BW CGPL_UPDATED_BW CHAR 1 0
BWIDENTIFIER Project Planning - BW Identification CGPL_BWIDENTIFIER NUMC 8 0
PLANGROUP Planning Profile Group CGPL_SEM_PLGRP CHAR 4 0
LATEST_START Latest start CGPL_LATEST_START DEC 15 0
LATEST_FINISH Latest finish date CGPL_LATEST_FINISH DEC 15 0
TOTAL_FLOAT Total Float CGPL_TOTAL_FLOAT DEC 8 2
DURATION Duration of Execution CGPL_DURATION DEC 8 2
DURATION_UNIT Time Unit for Execution Duration CGPL_DURATION_UNIT UNIT 3 0
CALENDAR_ID Factory Calendar WFCID CHAR 2 0
CONSTR_TYPE_FIN Type of Scheduling Constraint CGPL_CONSTRAINT CHAR 1 0
0 Earliest possible
1 Latest possible
2 Must start on
3 Must finish on
4 Start no earlier than
5 Start no later than
6 Finish no earlier than
7 Finish no later than
CONSTR_TIME_FIN Constraint Date CGPL_CONSTRAINT_TIME DEC 15 0
APPLICATION Application in Project Planning CGPL_APPLICATION_TYPE CHAR 3 0
FORECAST_START Forecast Start CGPL_FORECAST_START DEC 15 0
FORECAST_FINISH Forecast Finish CGPL_FORECAST_FINISH DEC 15 0
RPM_PROJECT RPM_TS_PROJECT_ATT STRU 0 0
CATEGORY Category RPM_PROJECT_CATEGORY NUMC 4 0
SUBCATEGORY Subcategory RPM_PROJ_SUBCATEGORY NUMC 4 0
PHASE Stage RPM_PROJECT_PHASE NUMC 4 0
PTYPE Group RPM_PROJECTTYPE NUMC 4 0
TTYPE Technology Type RPM_PROJECT_TECHTYPE NUMC 4 0
APSTAT Project Approval Status RPM_PROJECT_APPST NUMC 4 0
EXSTAT Project Execution Status RPM_PROJECT_EXECSTAT NUMC 4 0
PPRIO Project Priority RPM_PROJECT_PRIORITY NUMC 4 0
RISKA Assessed Project Risk RPM_PROJECT_RISK_ASSESED NUMC 3 0
PROBT Probability of Technical Success RPM_PROJECT_PROB_TECH NUMC 3 0
PROBC Probability of Commercial Success RPM_PROJECT_PROB_COMM NUMC 3 0
HEADC Actual Headcount RPM_PROJECT_HEADCOUNT DEC 10 2
BUDGT Budget RPM_PROJECT_BUDGET_PLAN CURR 16 2
COSTF Planned Cost RPM_PROJECT_COST_FORECAST CURR 16 2
COSTA Actual Cost RPM_PROJECT_COST_ACTUAL CURR 16 2
COSTD Development Cost RPM_PROJECT_COST_DEVELOPMENT CURR 16 2
COSTL Launch Cost RPM_PROJECT_COST_LAUNCH CURR 16 2
NPV Net Present Value (manual) RPM_PROJECT_NPV CURR 16 2
CURRENCY Currency key RPM_TV_CURRENCY CUKY 5 0
LOCATION Location DPR_TV_LOCATION CHAR 4 0
GEOGRAPHY Area DPR_TV_AREA CHAR 4 0
ACTUAL_HEADCOUNT Actual Headcount RPM_TV_HEADCOUNT DEC 10 2
RPM_CHANGED_ON Time Stamp RPM_TV_TIMESTAMP DEC 15 0
ACTUAL_WORK Actual Work RPM_TV_ACTUAL_WORK DEC 10 2
PLANNED_WORK Planned Work RPM_TV_PLANNED_WORK DEC 10 2
WORK_UNITS Assignment Unit RPM_TV_ALLOCATION_UNIT CHAR 3 0
FTE Full Time Equivalents
DAY Person Days
HRS Hours Worked
BASELINE_START Baseline Start RPM_TV_BASELINE_START DATS 8 0
BASELINE_FINISH Baseline Finish RPM_TV_BASELINE_FINISH DATS 8 0
COSTF_TD Planned Cost RPM_PROJECT_COST_FORECAST CURR 16 2
COSTA_TD Actual Cost RPM_PROJECT_COST_ACTUAL CURR 16 2
ANNUAL_BUDGET Budget RPM_PROJECT_BUDGET_PLAN CURR 16 2
PERIODTYPE Period Type (Weekly/Monthly/Generic Interval) RPM_TV_AVLB_PERIOD NUMC 2 0
01 Month
02 Week
04 Generic Interval
UNIT Project Resource Supply - Unit RPM_TV_RESOURCE_AVAIL_UNIT CHAR 3 0
FTE Full Time Equivalents
DAY Person Days
HRS Hours Worked
VERSION Project Version Type RPM_TV_VERSION_TYPE CHAR 1 0
NULL Not a version - original Project
1 What-If Scenario Version
2 What-if Scenario version with Cap. Mgmt
ITEM_TYPE Type /RPM/TV_ITEM_ID CHAR 15 0
PORTFL_ITEM_GUID Guid for application objects RPM_TV_GUID RAW 16 0
ESCALATION Escalation Flag RPM_TV_ESCALATION CHAR 1 0
X Yes
NULL No
FORECAST_START Forecasted Start RPM_TV_FORECAST_START DATS 8 0
PLANNED_START Planned Start Date RPM_TV_PLAN_START DATS 8 0
ACTUAL_START Actual Start Date RPM_TV_ACTUAL_START DATS 8 0
FORECAST_FINISH Forecasted Finish Date RPM_TV_FORECAST_FINISH DATS 8 0
PLANNED_FINISH Planned Finish Date RPM_TV_PLAN_FINISH DATS 8 0
ACTUAL_FINISH Actual Finish Date RPM_TV_ACTUAL_FINISH DATS 8 0
PORTFOLIO_GUID Guid for application objects RPM_TV_GUID RAW 16 0
PARENT_GUID Guid for application objects RPM_TV_GUID RAW 16 0
ECV Expected Commercial Value (manual) RPM_TV_ECV CURR 16 2
PRIORITY_GROUP Priority Group RPM_PRIORITY_GROUP NUMC 2 0
CHANGED_BY User Name UNAME CHAR 12 0
VERSION_ITEM Single-Character Indicator CHAR1 CHAR 1 0
ITEM_CLASS Item Classification /RPM/TV_ITEM_CLASS CHAR 1 0
NULL Item
1 Item of an Initiative
2 Sub Item
4 Item Template
MASTER_ITEM_GUID Guid for application objects RPM_TV_GUID RAW 16 0
STATUS Status /RPM/TV_STATUS_COMMON CHAR 5 0
CAP_PERIODTYPE Capacity Period Breakdown /RPM/TV_CAP_PERIOD_TYPE NUMC 2 0
ACT_DPCPT_GUID Guid for application objects /RPM/TV_GUID RAW 16 0
DISCOUNT_RATE Discount Rate /RPM/TV_DISCOUNT_RATE DEC 5 2
INITIATIVE_GUID Guid for application objects RPM_TV_GUID RAW 16 0
FRCST_BGT_TOTAL Portfolio Item Forecasted Budget Total /RPM/TV_FORECASTED_BUDGT_TOTAL CURR 16 2
FRCST_BGTANNUAL Portfolio Item Forecasted Budget Annual /RPM/TV_FORECASTED_BUDGT_ANNL CURR 16 2
FRCST_COSTTOTAL Portfolio Item Forecasted Cost Total /RPM/TV_FORECASTED_COST_TOTAL CURR 16 2
FRCST_COST_YTD Portfolio Item Forecasted Cost YTD /RPM/TV_FORECASTED_COST_YTD CURR 16 2
TEMPLATE_GUID Guid for application objects /RPM/TV_GUID RAW 16 0
IS_GLOBAL Global Template /RPM/TV_GLOBAL CHAR 1 0
X Yes
NULL No
EA_DUMMY Dummy Data Element for Enhanced xRPM Attributes /RPM/TV_EA_DUMMY CHAR 1 0
ZRDS_BUDGET Custom Field Budget Status (RDS) ZRDS_BUDGETSTATUS CHAR 2 0
01 Budget Proposal
02 Budget Approved
03 Budget Replanned
04 Budget Reapproved
05 Budget Declined
ZRDS_STRATFIT KPI Strategic Fit Questionnaire (RDS) ZRDS_STRATFIT INT1 3 0
ZRDS_TECHRISK KPI Technological Risk Questionnaire (RDS) ZRDS_TECHRISK INT1 3 0
ZRDS_SOCRISK KPI Social Risk Questionnaire (RDS) ZRDS_SOCRISK INT1 3 0
ZRDS_OVSCORE KPI Overall Score (RDS) ZRDS_OVSCORE INT1 3 0
ZRDS_BUDGET_S Custom Field Budget Status (RDS PPM) ZRDS_BUDGET_STATUS CHAR 2 0
01 Budget Proposed
02 Budget Approved
03 Budget Replanned
04 Budget Reapproved
05 Budget Declined
ZRDS_OVASCORE KPI Overall Score Scoring Model (RDS PPM) ZRDS_OVALLSCORE INT1 3 0
ZANUAL_ES Estimated Energy Savings/year(GJ) ZANUAL_ES NUMC 5 0
ZANUAL_CS Estimated Savings $ ZANUAL_CS CURR 16 2
ZIMP_COST Estimated Costs $ ZIMP_COST CURR 16 2
ZANNUAL_COST Annual Costs $ ZANNUAL_COST CURR 16 2
ZSPEND_CAT Spend Category ZPEND_CAT CHAR 60 0
01 Capital
02 Operating
ZROI 3-Year ROI % ZROI INT4 10 0
ZPAYBK Estimated Payback Period (months) ZPAYBK NUMC 5 0
ZAPPROVER APPROVER ZAPPROVER CHAR 60 0
01 01
02 02
ZTEST Approver ZTEST CHAR 60 0
ZACTROI 3-Year Actual ROI % ZACTROI INT4 10 0
ZANUAL_ACTES Actual Energy Savings/Year (GJ) ZANUAL_ACTES NUMC 5 0
ZIMP_ACOST Actual Costs $ ZIMP_ACTCOST CURR 16 2
ZACRPAYBK Actual Payback Period (months) ZACRPAYBK NUMC 5 0
ZANUAL_ACTCS Actual Savings $ ZANUAL_ACTCS CURR 16 2
ZITSPONSOR IT Sponsor ZITSPONSOR CHAR 40 0
ZBS Business Sponsor ZBS CHAR 40 0
RPM_PROJECT_STKHLDR RPM_TT_PROJ_STKHLD_WITH_BUPA TTYP 0 0
DEPENDENCIES_INT RPM_TT_PROJ_DEPENDENCY_INT TTYP 0 0
RPM_ILINKS /RPM/TT_ITEM_ILINKS TTYP 0 0
ITEM_DER /RPM/TS_ITEM_D_DERIVED_ATT STRU 0 0
PRIORITY_ICON Priority /RPM/TV_PRIORITY_ICON CHAR 4 0
RISK_PRCNT Risk Group - Upper Limit RPM_RISK_LIMIT_HIGH NUMC 3 0
RISK_GROUP Risk Group Assessed RPM_RISK_GROUP NUMC 2 0
RISK_ICON Risk /RPM/TV_RISK_ICON CHAR 4 0
PHASE_ICON Phase /RPM/TV_PHASE_ICON CHAR 4 0
PHASE_COLOR Alert Object Color Status RPM_TV_STATUS_COLOR CHAR 7 0
#FFFF00 Yellow default
#FFFFCC Yellow 1
#FFFF77 Yellow 2
#FFED00 Yellow 4
#FFDC11 Yellow 5
#00CF00 Green default
#CCFF77 Green 2
#CCFF00 Green 3
#CCED00 Green 4
#CCDC11 Green 5
#AADDFF Blue 1
#88CCFF Blue 2
#44BBFF Blue 3
#2288FF Blue 4
#0055FF Blue 5
#FF0000 Red default
#FF9999 Red 1
#FF6666 Red 2
#FF3333 Red 3
#FF1100 Red 4
#EE1100 Red 5
#FFCC99 Brown 1
#DD9966 Brown 2
#CC6622 Brown 3
#996600 Brown 4
#663300 Brown 5
#CC99FF Purple 1
#CC66FF Purple 2
#9933FF Purple 3
#6633CC Purple 4
#660099 Purple 5
#FF9900 Orange default
#FFCC77 Orange 1
#FFCC33 Orange 2
#FFBB00 Orange 3
#FF7700 Orange 5
#FFFFFF White
#000000 Black
#FF00FF Pink
#E8E8D3 Beige
#000080 Dark Blue
#00FFFF Turquoise
DERIVED_RISK Derived Risk RPM_TV_RISK_DERIVED NUMC 3 0
D_PLANSTART Planned Start /RPM/TV_DP_PLAN_START DATS 8 0
D_PLANFINISH Planned Finish /RPM/TV_DP_PLAN_FINISH DATS 8 0
D_ACTUALSTART Actual Start /RPM/TV_DP_ACTUAL_START DATS 8 0
D_ACTUALFINISH Actual Finish Date /RPM/TV_DP_ACTUAL_FINISH DATS 8 0
HEADC_ACTUAL Actual Headcount RPM_PROJECT_HEADCOUNT DEC 10 2
BEGDA_DEM Demand Planning Start /RPM/TV_PP_START_DEM DATS 8 0
ENDDA_DEM Demand Planning Period Finish Date /RPM/TV_PP_END_DEM DATS 8 0
BEGDA_FIN Financial Planning Period Start /RPM/TV_PP_START_FIN DATS 8 0
ENDDA_FIN Financial Plan Period Finish Date /RPM/TV_PP_END_FIN DATS 8 0
BUCKET_NAME Bucket Name /RPM/TV_BUCKET_NAME CHAR 40 0
BUCKET_ID Bucket ID /RPM/TV_BUCKET_ID CHAR 24 0
PROPOSAL Proposal /RPM/TV_PROPOSAL CHAR 1 0
X Yes
NULL No
D_CHANGED_ON Changed On Date /RPM/TV_LAST_CHANGED_ON DATS 8 0
MASTER_ITEM_NAME Initiative Name /RPM/TV_MASTER_ITEM_NAME CHAR 40 0
MASTER_ITEM_ID Initiative ID /RPM/TV_MASTER_ITEM_ID CHAR 24 0
HAS_CHILDREN Has Children /RPM/TV_ITEM_CHILDREN CHAR 1 0
X Yes
NULL No
BUDGET_ICON Budget /RPM/TV_BUDGET_ICON CHAR 4 0
SCHEDULE_ICON Schedule /RPM/TV_SCHEDULE_ICON CHAR 4 0
STAFFING_ICON Staffing /RPM/TV_STAFFING_ICON CHAR 4 0
BUDGET_TOTAL Total Budget /RPM/TV_BUDGET_TOTAL CURR 16 2
BUDGET_ANNUAL Annual Budget /RPM/TV_BUDGET_ANNUAL CURR 16 2
PLANNED_COST Planned Costs /RPM/TV_PLANNED_COST CURR 16 2
PLANNED_COST_YTD Planned Costs Year to Date /RPM/TV_PLANNED_COST_YTD CURR 16 2
ACTUAL_COST Actual Costs /RPM/TV_ACTUAL_COST CURR 16 2
ACTUAL_COST_YTD Actual Cost Year to Day /RPM/TV_ACTUAL_COST_YTD CURR 16 2
ACT_DECPT_NAME Decision Point Name /RPM/TV_PHASE_T CHAR 80 0
ACT_DECPT_STAT_TEXT Active Decision Point Status Text /RPM/TV_STATUS_TEXT CHAR 40 0
ACT_DECPT_STAT_ICON Active Decision Point Status /RPM/TV_DECPT_STATUS_ICON CHAR 4 0
DECPT_INFO Decision Point Info /RPM/TV_DECPT_INFO CHAR 20 0
STATUS_GROUP Status Group /RPM/TV_ITEM_STATUS_GROUP CHAR 4 0
NULL Not specified
0100 Created/Not Started
0200 Proposed
0300 To be approved
0400 Active
0500 Canceled
0600 Delayed
0700 Closed
0800 Rejected
0900 Ready For Review
1000 To be Archived
1100 Archived
FORECASTED_DURATION Forecasted Duration /RPM/TV_FORCASTED_DURATION QUAN 4 0
PLANNED_DURATION Planned Duration /RPM/TV_PLANNED_DURATION QUAN 4 0
ACTUAL_DURATION Actual Duration /RPM/TV_ACTUAL_DURATION QUAN 4 0
ACT_PHASE_GUID Application Object GUID DPR_TV_GUID RAW 16 0
WORKEFFORT_TOTAL Actual Effort /RPM/TV_WORK_EFFORT_TOTAL DEC 26 2
WORKEFFORT_YTD Actual Work Effort Year-To-Date /RPM/TV_WORK_EFFORT_YTD DEC 26 2
PLANNED_EFFORT Planned Effort /RPM/TV_PLAN_EFFORT DEC 26 2
PLANNED_EFFORT_YTD Planned Effort Year-To-Date /RPM/TV_PLAN_EFFORT_YTD DEC 26 2
ROI Return on Investment in % (manual) /RPM/TV_ROI CURR 16 2
IRR Internal Rate of Return in % (manual) /RPM/TV_IRR CURR 16 2
RISK_GROUP_D Risk Group Derived /RPM/RISK_GROUP_D NUMC 2 0
RISK_D_ICON Derived Risk /RPM/TV_RISK_ICON_D CHAR 4 0
PLANNED_DECISION_DATE Planned Decision date /RPM/TV_PLAND_DDATE DATS 8 0
ACTUAL_DECISION_DATE Actual Decision Date /RPM/TV_ACTUAL_DDATE DATS 8 0
FORECAST_DEC_DATE Forecasted Decision Date /RPM/TV_FORECAST_DDATE DATS 8 0
D_FORECASTED_START Forecasted Start RPM_TV_DP_FORECAST_START DATS 8 0
D_FORECASTED_FINISH Forecasted Finish Date RPM_TV_DP_FORECAST_FINISH DATS 8 0
BUDGET_GROUP Budget Status Group RPM_TV_BUDGET_GROUP NUMC 2 0
SCHEDULE_GROUP Schedule Status Group RPM_TV_SCHEDULE_GROUP NUMC 2 0
STAFFING_GROUP Staffing Status Group RPM_TV_STAFFING_GROUP NUMC 2 0
PORTFOLIO_NAME Portfolio Name /RPM/TV_PORTFOLIO_NAME CHAR 40 0
PORTFOLIO_ID Portfolio ID /RPM/TV_PORTFOLIO_ID CHAR 24 0
PLANNED_REVENUE Planned Revenues /RPM/TV_PLANNED_REVENUE CURR 16 2
PLANNED_REV_YTD Planned Revenues Year to Date /RPM/TV_PLANNED_REVENUE_YTD CURR 16 2
ACTUAL_REVENUE Actual Revenues /RPM/TV_ACTUAL_REVENUE CURR 16 2
ACTUAL_REV_YTD Actual Revenues Year to Day /RPM/TV_ACTUAL_REVENUE_YTD CURR 16 2
NPV_PLAN Net Present Value /RPM/TV_NPV_PLAN CURR 16 2
IRR_PLAN Internal Rate of Return in % /RPM/TV_IRR_PLAN CURR 16 2
ROI_PLAN Return on Investment in % /RPM/TV_ROI_PLAN CURR 16 2
PAYBACK_PLAN Payback Periods in Months /RPM/TV_PAYBACK_PLAN NUMC 6 0
ECV_PLAN Expected Commercial Value /RPM/TV_ECV_PLAN CURR 16 2
EA_DUMMY_KPI Single-Character Indicator CHAR1 CHAR 1 0