PLAF (Planned Order) is a standard table in SAP R\3 ERP systems. Below you can find the technical details of the fields that make up this table. Key fields are marked in blue.
Additionally we provide an overview of foreign key relationships, if any, that link PLAF to other SAP tables.
| Field | Data element | Checktable | Datatype | Length | Decimals | Possible values | ||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
MANDT
Client
|
MANDT |
CLNT
|
3 | 0 | ||||||||||||||||||||||
|
PLNUM
Planned order number
|
PLNUM |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
MATNR
Planning material
|
PLMAT | MARA |
CHAR
|
18 | 0 | |||||||||||||||||||||
|
PLWRK
Planning Plant
|
PLWRK | T001W |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
PWWRK
Production plant in planned order
|
PWWRK | T001W |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
PAART
Order type
|
PAART |
CHAR
|
4 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
BESKZ
Procurement Type
|
BESKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
SOBES
Special procurement type
|
SOBES |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
GSMNG
Total planned order quantity
|
GSMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
TLMNG
Partial lot quantity
|
TLMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
AVMNG
Fixed quantity of scrap from production
|
AVMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
BDMNG
Requirement Quantity
|
BDMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
PSTTR
Order start date in planned order
|
PSTTR |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
PEDTR
Order finish date in the planned order
|
PEDTR |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
PERTR
Planned opening date in planned order
|
PERTR |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
WEBAZ
Goods receipt processing time in days
|
PLWEZ |
DEC
|
3 | 0 | ||||||||||||||||||||||
|
DISPO
MRP Controller (Materials Planner)
|
DISPO | T024D |
CHAR
|
3 | 0 | |||||||||||||||||||||
|
UMSKZ
Conversion indicator for planned order
|
PLUMS |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
AUFFX
Firming indicator for planned order data
|
PLAFX |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
STLFX
Fixing indicator for BOM explosion
|
PLSFX |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
KNTTP
Account Assignment Category
|
KNTTP | T163K |
CHAR
|
1 | 0 | |||||||||||||||||||||
|
KDAUF
Sales Order Number
|
KDAUF | VBUK |
CHAR
|
10 | 0 | |||||||||||||||||||||
|
KDPOS
Item Number in Sales Order
|
KDPOS |
NUMC
|
6 | 0 | ||||||||||||||||||||||
|
KDEIN
Delivery Schedule for Sales Order
|
KDEIN |
NUMC
|
4 | 0 | ||||||||||||||||||||||
|
PROJN
Old: Project number : No longer used --> PS_POSNR
|
PROJN |
CHAR
|
16 | 0 | ||||||||||||||||||||||
|
RSNUM
Number of Reservation/Dependent Requirement
|
RSNUM |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
QUNUM
Number of Quota Arrangement
|
QUNUM |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
QUPOS
Quota Arrangement Item
|
QUPOS |
NUMC
|
3 | 0 | ||||||||||||||||||||||
|
FLIEF
Fixed Vendor
|
FLIEF | LFA1 |
CHAR
|
10 | 0 | |||||||||||||||||||||
|
KONNR
Number of Principal Purchase Agreement
|
KONNR | EKKO |
CHAR
|
10 | 0 | |||||||||||||||||||||
|
KTPNR
Item Number of Principal Purchase Agreement
|
KTPNR | EKPO |
NUMC
|
5 | 0 | |||||||||||||||||||||
|
EKORG
Purchasing Organization
|
EKORG | T024E |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
LGORT
Storage Location
|
LGORT_D | T001L |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
NUMVR
Version number
|
NUMVR |
NUMC
|
2 | 0 | ||||||||||||||||||||||
|
KZVBR
Consumption Posting
|
KZVBR |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
SOBKZ
Special Stock Indicator
|
SOBKZ | T148 |
CHAR
|
1 | 0 | |||||||||||||||||||||
|
PSPEL
WBS Element
|
PS_POSNR |
NUMC
|
8 | 0 | ||||||||||||||||||||||
|
SERNR
BOM explosion number
|
SERNR | SNUM |
CHAR
|
8 | 0 | |||||||||||||||||||||
|
PALTR
Explosion date
|
PALTR |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
TECHS
Parameter Variant/Standard Variant
|
TECHS |
CHAR
|
12 | 0 | ||||||||||||||||||||||
|
STLAN
BOM Usage
|
STLAN |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
STALT
Alternative BOM
|
STALT |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
STSTA
BOM status
|
STLST | T415S |
NUMC
|
2 | 0 | |||||||||||||||||||||
|
AENNR
Change Number
|
AENNR |
CHAR
|
12 | 0 | ||||||||||||||||||||||
|
ARSNR
Settlement reservation number
|
ARSNR |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
ARSPS
Item number of the settlement reservation
|
ARSPS |
NUMC
|
4 | 0 | ||||||||||||||||||||||
|
VERTO
Distribution key for quantity produced
|
SA_VERTO | T437V |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
VERID
Production Version
|
VERID | MKAL |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
AUFNR
Run schedule header number
|
SA_AUFNR | SAFK |
CHAR
|
12 | 0 | |||||||||||||||||||||
|
TRART
Scheduling type of the planned order
|
TRART |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
PLGRP
Production Supervisor
|
FEVOR | T024F |
CHAR
|
3 | 0 | |||||||||||||||||||||
|
TERST
Start date for production
|
TERST |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
TERED
Finish date for production
|
TERED |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
BEDID
ID of the capacity requirements record
|
BEDID |
NUMC
|
12 | 0 | ||||||||||||||||||||||
|
AUFPL
Routing number of operations in the order
|
CO_AUFPL |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
LINID
ID for a schedule record
|
SP_OPID |
NUMC
|
15 | 0 | ||||||||||||||||||||||
|
TRMKZ
Scheduling indicator
|
TRMFL |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
TRMER
Scheduling error
|
TRMER |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
REDKZ
Reduction indicator for scheduling
|
REDKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
TRMHK
Scheduling source
|
TRMHK |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
PLNNR
Key for Task List Group
|
PLNNR |
CHAR
|
8 | 0 | ||||||||||||||||||||||
|
PLNAL
Group Counter
|
PLNAL |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
PLNTY
Task List Type
|
PLNTY |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
FRTHW
Production note in the planned order
|
FRTHW |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
RGEKZ
Indicator: Backflushing for order
|
CO_RGEKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
MEINS
Base Unit of Measure
|
MEINS | T006 |
UNIT
|
3 | 0 | |||||||||||||||||||||
|
CUOBJ
Configuration (internal object number)
|
CUOBJ |
NUMC
|
18 | 0 | ||||||||||||||||||||||
|
REVLV
Revision Level
|
REVLV |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
ABMNG
Reduced quantity in the planned order
|
ABMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
RATID
Index for the results of scheduling production rates
|
RATID |
NUMC
|
12 | 0 | ||||||||||||||||||||||
|
GROID
Index for rough scheduling results
|
GROID |
NUMC
|
12 | 0 | ||||||||||||||||||||||
|
RATER
Scheduling error in scheduling production rates
|
RATER |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
GROER
Scheduling error in rough scheduling
|
GROER |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
OBART
Object type
|
OBART |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
PLSCN
Planning Scenario of Long-Term Planning
|
PLSCN | PLSC |
NUMC
|
3 | 0 | |||||||||||||||||||||
|
SBNUM
Simulation requirements number
|
SBNUM |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
KBNKZ
Kanban Indicator
|
KBNKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
KAPFX
Indicator: capacity for planned order dispatched
|
KAPFX |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
SEQNR
Seq. number order
|
CY_SEQNR |
NUMC
|
14 | 0 | ||||||||||||||||||||||
|
PSTTI
Start Time of Planned Order
|
PSTTI |
TIMS
|
6 | 0 | ||||||||||||||||||||||
|
PEDTI
End Time of Planned Order
|
PEDTI |
TIMS
|
6 | 0 | ||||||||||||||||||||||
|
MONKZ
Indicator: for assembly order procedures
|
MONKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
PRNKZ
Ind.: Leading order in collective order is planned ordre
|
PRNKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
MDPBV
Planned order: confirmation of availability
|
MDPBV |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
VFMNG
Planned order: committed quantity
|
VFMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
MDACH
Action control: planned order processing
|
MDACH | T46AC |
CHAR
|
2 | 0 | |||||||||||||||||||||
|
MDACC
Action: planned order processing
|
MDACC | T46AS |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
MDACD
Date of action: planned order
|
MDACD |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
MDACT
Time of action: Planned order processing
|
MDACT |
TIMS
|
6 | 0 | ||||||||||||||||||||||
|
GSBTR
Total commitment date of plnd ord. after ATP check f.comps.
|
GSBTR_PLAF |
DATS
|
8 | 0 | ||||||||||||||||||||||
|
PLETX
Planned order shift quantities exist
|
PLETX |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
PRSCH
Planned order: scheduling using production dates
|
MD_PRSCHED |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
LVSCH
Planned order: leading scheduling level (determines dates)
|
MD_LVSCHED |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
KZAVC
Indicator for type of availability check
|
KZAVC |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
VRPLA
Indicator: planning without final assembly
|
VRPLA |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
PBDNR
Requirements Plan Number
|
PBDNR |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
AGREQ
Requirements totaling
|
AGREQ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
UMREZ
Numerator for Conversion to Base Units of Measure
|
UMREZ |
DEC
|
5 | 0 | ||||||||||||||||||||||
|
UMREN
Denominator for conversion to base units of measure
|
UMREN |
DEC
|
5 | 0 | ||||||||||||||||||||||
|
ERFMG
Quantity in Unit of Entry
|
ERFMG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
ERFME
Unit of Entry
|
ERFME | T006 |
UNIT
|
3 | 0 | |||||||||||||||||||||
|
RQNUM
Requirements record number
|
RQNUM |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
KZBWS
Valuation of Special Stock
|
KZBWS |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
WEMNG
Quantity of Goods Received
|
WEMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
WAMNG
Issued Quantity
|
WAMNG |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
EDGNO
Internal number for edge of object dependencies tree
|
EDGNO | M60I |
NUMC
|
17 | 0 | |||||||||||||||||||||
|
LBLKZ
Subcontracting vendor
|
LBLKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
EMLIF
Vendor to be supplied/who is to receive delivery
|
EMLIF |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
BERID
MRP Area
|
BERID | MDLV |
CHAR
|
10 | 0 | |||||||||||||||||||||
|
UBERI
Issuing MRP area when transferring stock
|
UBERI |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
EMATN
Material Number Corresponding to Manufacturer Part Number
|
EMATN |
CHAR
|
18 | 0 | ||||||||||||||||||||||
|
REMFL
Repetitive Manufacturing indicator
|
REMFL |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
PSTMP
Last Change to Planned Order: Time Stamp
|
PSTMP |
DEC
|
15 | 0 | ||||||||||||||||||||||
|
PUSER
Last Change to Planned Order: User
|
PUSER |
CHAR
|
12 | 0 | ||||||||||||||||||||||
|
BADI
Object change via active Business Add-In
|
MD_BADI |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
STAEX
Status information on BOM explosion in planned order
|
MD_STAEX |
CHAR
|
2 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
RESLO
Issuing Storage Location for Stock Transport Order
|
RESLO | T001L |
CHAR
|
4 | 0 | |||||||||||||||||||||
|
SRM_CONTRACT_ID
Central Contract
|
SRM_CONTRACT_ID |
CHAR
|
10 | 0 | ||||||||||||||||||||||
|
SRM_CONTRACT_ITM
Central Contract Item Number
|
SRM_CONTRACT_ITEM |
NUMC
|
10 | 0 | ||||||||||||||||||||||
|
MEDKZ
Indicator for Distributed Planned Order
|
MEDKZ |
CHAR
|
1 | 0 | ||||||||||||||||||||||
|
||||||||||||||||||||||||||
|
CNFQTY
Total Confirmed Qty Planned Order (Repetitive Manufacturing)
|
MD_MES_CNF_QTY |
QUAN
|
13 | 3 | ||||||||||||||||||||||
|
KUNNR
Customer Number
|
KUNNR |
CHAR
|
10 | 0 | ||||||||||||||||||||||
| Table | Field | Foreign key table | Foreign key field | Check table | Check field |
|---|---|---|---|---|---|
| PLAF | AUFNR | PLAF | MANDT |
SAFK
Run Schedule Master Data
|
MANDT |
| PLAF | AUFNR | PLAF | AUFNR |
SAFK
Run Schedule Master Data
|
AUFNR |
| PLAF | BERID | PLAF | MANDT |
MDLV
Customizing MRP Area
|
MANDT |
| PLAF | BERID | PLAF | BERID |
MDLV
Customizing MRP Area
|
BERID |
| PLAF | DISPO | PLAF | PLWRK |
T024D
MRP controllers
|
WERKS |
| PLAF | DISPO | PLAF | DISPO |
T024D
MRP controllers
|
DISPO |
| PLAF | DISPO | PLAF | MANDT |
T024D
MRP controllers
|
MANDT |
| PLAF | EDGNO | PLAF | MANDT |
M60I
Object dependencies tree structure for chars planning
|
MANDT |
| PLAF | EDGNO | PLAF | EDGNO |
M60I
Object dependencies tree structure for chars planning
|
EDGNO |
| PLAF | EKORG | PLAF | MANDT |
T024E
Purchasing Organizations
|
MANDT |
| PLAF | EKORG | PLAF | EKORG |
T024E
Purchasing Organizations
|
EKORG |
| PLAF | ERFME | PLAF | MANDT |
T006
Units of Measurement
|
MANDT |
| PLAF | ERFME | PLAF | ERFME |
T006
Units of Measurement
|
MSEHI |
| PLAF | FLIEF | PLAF | FLIEF |
LFA1
Vendor Master (General Section)
|
LIFNR |
| PLAF | FLIEF | PLAF | MANDT |
LFA1
Vendor Master (General Section)
|
MANDT |
| PLAF | KDAUF | PLAF | MANDT |
VBUK
Sales Document: Header Status and Administrative Data
|
MANDT |
| PLAF | KDAUF | PLAF | KDAUF |
VBUK
Sales Document: Header Status and Administrative Data
|
VBELN |
| PLAF | KNTTP | PLAF | KNTTP |
T163K
Account Assignment Categories in Purchasing Document
|
KNTTP |
| PLAF | KNTTP | PLAF | MANDT |
T163K
Account Assignment Categories in Purchasing Document
|
MANDT |
| PLAF | KONNR | PLAF | MANDT |
EKKO
Purchasing Document Header
|
MANDT |
| PLAF | KONNR | PLAF | KONNR |
EKKO
Purchasing Document Header
|
EBELN |
| PLAF | KTPNR | PLAF | MANDT |
EKPO
Purchasing Document Item
|
MANDT |
| PLAF | KTPNR | PLAF | KONNR |
EKPO
Purchasing Document Item
|
EBELN |
| PLAF | KTPNR | PLAF | KTPNR |
EKPO
Purchasing Document Item
|
EBELP |
| PLAF | LGORT | PLAF | MANDT |
T001L
Storage Locations
|
MANDT |
| PLAF | LGORT | PLAF | PLWRK |
T001L
Storage Locations
|
WERKS |
| PLAF | LGORT | PLAF | LGORT |
T001L
Storage Locations
|
LGORT |
| PLAF | MATNR | PLAF | MANDT |
MARA
General Material Data
|
MANDT |
| PLAF | MATNR | PLAF | MATNR |
MARA
General Material Data
|
MATNR |
| PLAF | MDACC | PLAF | MDACC |
T46AS
Action code text
|
MDACC |
| PLAF | MDACC | PLAF | MANDT |
T46AS
Action code text
|
MANDT |
| PLAF | MDACH | PLAF | MANDT |
T46AC
Action control
|
MANDT |
| PLAF | MDACH | PLAF | MDACH |
T46AC
Action control
|
MDACH |
| PLAF | MDACH | * |
T46AC
Action control
|
ACCFM | |
| PLAF | MDACH | * |
T46AC
Action control
|
ACCTO | |
| PLAF | MEINS | PLAF | MANDT |
T006
Units of Measurement
|
MANDT |
| PLAF | MEINS | PLAF | MEINS |
T006
Units of Measurement
|
MSEHI |
| PLAF | PLGRP | PLAF | PWWRK |
T024F
Production scheduler
|
WERKS |
| PLAF | PLGRP | PLAF | PLGRP |
T024F
Production scheduler
|
FEVOR |
| PLAF | PLGRP | PLAF | MANDT |
T024F
Production scheduler
|
MANDT |
| PLAF | PLSCN | PLAF | MANDT |
PLSC
Planning scenarios in long-term planning
|
MANDT |
| PLAF | PLSCN | PLAF | PLSCN |
PLSC
Planning scenarios in long-term planning
|
PLSCN |
| PLAF | PLWRK | PLAF | MANDT |
T001W
Plants/Branches
|
MANDT |
| PLAF | PLWRK | PLAF | PLWRK |
T001W
Plants/Branches
|
WERKS |
| PLAF | PWWRK | PLAF | PWWRK |
T001W
Plants/Branches
|
WERKS |
| PLAF | PWWRK | PLAF | MANDT |
T001W
Plants/Branches
|
MANDT |
| PLAF | RESLO | PLAF | PWWRK |
T001L
Storage Locations
|
WERKS |
| PLAF | RESLO | PLAF | RESLO |
T001L
Storage Locations
|
LGORT |
| PLAF | RESLO | PLAF | MANDT |
T001L
Storage Locations
|
MANDT |
| PLAF | SERNR | PLAF | SERNR |
SNUM
BOM explosion number
|
SERNR |
| PLAF | SERNR | PLAF | MANDT |
SNUM
BOM explosion number
|
MANDT |
| PLAF | SOBKZ | PLAF | MANDT |
T148
Special Stock Indicator
|
MANDT |
| PLAF | SOBKZ | PLAF | SOBKZ |
T148
Special Stock Indicator
|
SOBKZ |
| PLAF | STSTA | PLAF | MANDT |
T415S
BOM status
|
MANDT |
| PLAF | STSTA | PLAF | STSTA |
T415S
BOM status
|
STLST |
| PLAF | VERID | PLAF | VERID |
MKAL
Production Versions of Material
|
VERID |
| PLAF | VERID | PLAF | MANDT |
MKAL
Production Versions of Material
|
MANDT |
| PLAF | VERID | PLAF | MATNR |
MKAL
Production Versions of Material
|
MATNR |
| PLAF | VERID | PLAF | PWWRK |
MKAL
Production Versions of Material
|
WERKS |
| PLAF | VERTO | PLAF | MANDT |
T437V
Distribution key in MRP
|
MANDT |
| PLAF | VERTO | PLAF | PWWRK |
T437V
Distribution key in MRP
|
WERKS |
| PLAF | VERTO | PLAF | VERTO |
T437V
Distribution key in MRP
|
VERTL |