MANDT |
Client |
MANDT |
T000
|
CLNT |
|
3 |
0 |
|
DISPR |
Material: MRP profile |
DISPR |
|
CHAR |
|
4 |
0 |
|
DISMM |
MRP Type |
DISMM |
T438A
|
CHAR |
|
2 |
0 |
|
DISPO |
MRP Controller (Materials Planner) |
DISPO |
T024D
|
CHAR |
|
3 |
0 |
|
KZDIE |
Indicator: MRP controller is buyer (deactivated) |
KZDIE |
|
CHAR |
|
1 |
0 |
Possible values
|
MAABC |
ABC Indicator |
MAABC |
TMABC
|
CHAR |
|
1 |
0 |
|
PLIFZ |
Planned Delivery Time in Days |
PLIFZ |
|
DEC |
|
3 |
0 |
|
DZEIT |
In-house production time |
DZEIT |
|
DEC |
|
3 |
0 |
|
FHORI |
Scheduling Margin Key for Floats |
FHORI |
T436A
|
CHAR |
|
3 |
0 |
|
SBDKZ |
Dependent requirements ind. for individual and coll. reqmts |
SBDKZ |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Individual and collective requirements |
1 |
Individual requirements only |
2 |
Collective requirements only |
|
KZBED |
Indicator for Requirements Grouping |
KZBED |
|
CHAR |
|
1 |
0 |
Possible values
T |
Display of dependent requirements as a daily total |
0 |
In rep. mfg, individual record in addn to total requirements |
|
EISBE |
Safety Stock |
EISBE |
|
QUAN |
|
13 |
3 |
|
MINBE |
Reorder Point |
MINBE |
|
QUAN |
|
13 |
3 |
|
DISLS |
Lot size (materials planning) |
DISLS |
T439A
|
CHAR |
|
2 |
0 |
|
BSTRF |
Rounding value for purchase order quantity |
BSTRF |
|
QUAN |
|
13 |
3 |
|
BSTMI |
Minimum Lot Size |
BSTMI |
|
QUAN |
|
13 |
3 |
|
BSTMA |
Maximum Lot Size |
BSTMA |
|
QUAN |
|
13 |
3 |
|
BSTFE |
Fixed lot size |
BSTFE |
|
QUAN |
|
13 |
3 |
|
MABST |
Maximum stock level |
MABST |
|
QUAN |
|
13 |
3 |
|
AUSSS |
Assembly scrap in percent |
AUSSS |
|
DEC |
|
5 |
2 |
|
LOSFX |
Ordering costs |
LOSFX |
|
CURR |
|
11 |
2 |
|
LAGPR |
Storage costs indicator |
LAGPR |
T439L
|
CHAR |
|
1 |
0 |
|
AUFTL |
Splitting Indicator |
AUFTL |
T439P
|
CHAR |
|
1 |
0 |
|
LGRAD |
Service level |
LGRAD |
|
DEC |
|
3 |
1 |
|
WEBAZ |
Goods Receipt Processing Time in Days |
WEBAZ |
|
DEC |
|
3 |
0 |
|
USEQU |
Quota arrangement usage |
USEQU |
TMQ2
|
CHAR |
|
1 |
0 |
|
PERKZ |
Period Indicator |
PERKZ |
|
CHAR |
|
1 |
0 |
Possible values
P |
Period according to fiscal year variant |
M |
Monthly |
W |
Weekly |
T |
Daily |
NULL |
Initial value |
|
PERIV |
Fiscal Year Variant |
PERIV |
T009
|
CHAR |
|
2 |
0 |
|
EKGRP |
Purchasing Group |
EKGRP |
T024
|
CHAR |
|
3 |
0 |
|
MRPPP |
PPC planning calendar |
MRPPP |
T439G
|
CHAR |
|
3 |
0 |
|
SAUFT |
Ind.: Repetitive mfg allowed |
SA_SAUFT |
|
CHAR |
|
1 |
0 |
Possible values
|
SFEPR |
Repetitive manufacturing profile |
SFEPR |
T437S
|
CHAR |
|
4 |
0 |
|
FXHOR |
Planning time fence |
FXHOR |
|
NUMC |
|
3 |
0 |
|
VRMOD |
Consumption mode |
VRMOD |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Backward consumption only |
2 |
Backward/forward consumption |
3 |
Forward consumption only |
4 |
Forward/backward consumption |
|
VINT1 |
Consumption period: backward |
VINT1 |
|
NUMC |
|
3 |
0 |
|
VINT2 |
Consumption period: forward |
VINT2 |
|
NUMC |
|
3 |
0 |
|
DISGR |
MRP Group |
DISGR |
T438M
|
CHAR |
|
4 |
0 |
|
KAUSF |
Component scrap in percent |
KAUSF |
|
DEC |
|
5 |
2 |
|
ALTSL |
Method for Selecting Alternative Bills of Material |
ALTSL |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Selection by order quant. |
1 |
Selection by explosion date |
2 |
Selection by production version |
3 |
Selection only by production version |
|
MISKZ |
Mixed MRP indicator |
MISKZ |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Subassembly planning with final assembly |
2 |
Gross requirements planning |
3 |
Subassembly planning without final assembly |
|
WZEIT |
Total replenishment lead time (in workdays) |
WZEIT |
|
DEC |
|
3 |
0 |
|
VPMAT |
Planning material |
VPMAT |
MARA
|
CHAR |
|
18 |
0 |
|
VPWRK |
Planning plant |
VPWRK |
MARC
|
CHAR |
|
4 |
0 |
|
VPREF |
Conv. factor f. plng material |
VPREF |
|
CHAR |
|
10 |
0 |
|
TAKZT |
Takt time |
TAKZT |
|
DEC |
|
3 |
0 |
|
RWPRO |
Range of coverage profile |
RWPRO |
T438R
|
CHAR |
|
3 |
0 |
|
LFRHY |
Planning cycle |
LFRHY |
T439G
|
CHAR |
|
3 |
0 |
|
RDPRF |
Rounding Profile |
RDPRF |
RDPR
|
CHAR |
|
4 |
0 |
|
STRGR |
Planning strategy group |
STRGR |
T461P
|
CHAR |
|
2 |
0 |
|
SOBSL |
Special procurement type |
SOBSL |
T460A
|
CHAR |
|
2 |
0 |
|
RGEKZ |
Indicator: Backflush |
RGEKM |
|
CHAR |
|
1 |
0 |
Possible values
1 |
Always backflush |
2 |
Work center decides whether to backflush |
|
SCHGT |
Indicator: Bulk Material |
SCHGT |
|
CHAR |
|
1 |
0 |
Possible values
|
WAERS |
Currency Key |
WAERS |
TCURC
|
CUKY |
|
5 |
0 |
|
SHFLG |
Safety time indicator (with or without safety time) |
SHFLG |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Ignore safety time |
1 |
Safety time for independent reqmts |
2 |
Safety time for all requirements |
|
SHZET |
Safety time (in workdays) |
SHZET |
|
NUMC |
|
2 |
0 |
|
MDACH |
Action control: planned order processing |
MDACH |
T46AC
|
CHAR |
|
2 |
0 |
|
LGPRO |
Issue Storage Location |
LGPRO |
T001L
|
CHAR |
|
4 |
0 |
|
MTVFP |
Checking Group for Availability Check |
MTVFP |
TMVF
|
CHAR |
|
2 |
0 |
|
BESKZ |
Procurement Type |
BESKZ |
|
CHAR |
|
1 |
0 |
Possible values
E |
In-house production |
F |
External procurement |
NULL |
No procurement |
X |
Both procurement types |
|
KZECH |
Determination of batch entry in the production/process order |
KZECH |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Batch in goods issue; no confirmation required |
1 |
Manual batch determination required upon release of order |
2 |
Batch not required in prod./process order; confirmation reqd |
3 |
Automatic batch determination upon release of order |
|
EISLO |
Minimum Safety Stock |
EISLO |
|
QUAN |
|
13 |
3 |
|
PLIFZX |
Consider Planned Delivery Time of the MRP Area |
MD_PLIFZ_DB |
|
CHAR |
|
1 |
0 |
Possible values
NULL |
Use Planned Delivery Time of the Plant |
X |
Use Planned Delivery Time of the MRP Area |
|