SAP Table RESB
Reservation/dependent requirements
RESB (Reservation/dependent requirements) is a standard table in SAP R\3 ERP systems. Below you can find the technical details of the fields that make up this table. Key fields are marked in blue.
Additionally we provide an overview of foreign key relationships, if any, that link RESB to other SAP tables.
RESB table fields
Field | Data element | Checktable | Datatype | Length | Decimals | |||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
MANDT | Client | MANDT | T000 | CLNT | 3 | 0 | ||||||||||||||||||
RSNUM | Number of Reservation/Dependent Requirement | RSNUM | NUMC | 10 | 0 | |||||||||||||||||||
RSPOS | Item Number of Reservation/Dependent Requirement | RSPOS | NUMC | 4 | 0 | |||||||||||||||||||
RSART | Record type | RSART | CHAR | 1 | 0 | |||||||||||||||||||
BDART | Requirement type | BDART | CHAR | 2 | 0 | |||||||||||||||||||
RSSTA | Status of reservation | RSSTA | CHAR | 1 | 0 | |||||||||||||||||||
XLOEK | Item is Deleted | XLOEK | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
XWAOK | Goods Movement for Reservation Allowed | XWAOK | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
KZEAR | Final Issue for This Reservation | KZEAR | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
XFEHL | Missing Part | XFEHL | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
MATNR | Material Number | MATNR | MARA | CHAR | 18 | 0 | ||||||||||||||||||
WERKS | Plant | WERKS_D | T001W | CHAR | 4 | 0 | ||||||||||||||||||
LGORT | Storage Location | LGORT_D | T001L | CHAR | 4 | 0 | ||||||||||||||||||
PRVBE | Production Supply Area | PRVBE | CHAR | 10 | 0 | |||||||||||||||||||
CHARG | Batch Number | CHARG_D | MCHA | CHAR | 10 | 0 | ||||||||||||||||||
PLPLA | Distribution of Differences | PLPLA | CHAR | 10 | 0 | |||||||||||||||||||
SOBKZ | Special Stock Indicator | SOBKZ | T148 | CHAR | 1 | 0 | ||||||||||||||||||
BDTER | Requirement Date for the Component | BDTER | DATS | 8 | 0 | |||||||||||||||||||
BDMNG | Requirement Quantity | BDMNG | QUAN | 13 | 3 | |||||||||||||||||||
MEINS | Base Unit of Measure | MEINS | T006 | UNIT | 3 | 0 | ||||||||||||||||||
SHKZG | Debit/Credit Indicator | SHKZG | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
FMENG | Quantity is Fixed | FMENG | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
ENMNG | Quantity Withdrawn | ENMNG | QUAN | 13 | 3 | |||||||||||||||||||
ENWRT | Value Withdrawn | ENWRT | CURR | 13 | 2 | |||||||||||||||||||
WAERS | Currency Key | WAERS | TCURC | CUKY | 5 | 0 | ||||||||||||||||||
ERFMG | Quantity in Unit of Entry | ERFMG | QUAN | 13 | 3 | |||||||||||||||||||
ERFME | Unit of Entry | ERFME | T006 | UNIT | 3 | 0 | ||||||||||||||||||
PLNUM | Planned order number | PLNUM | PLAF | CHAR | 10 | 0 | ||||||||||||||||||
BANFN | Purchase Requisition Number | BANFN | CHAR | 10 | 0 | |||||||||||||||||||
BNFPO | Item Number of Purchase Requisition | BNFPO | EBAN | NUMC | 5 | 0 | ||||||||||||||||||
AUFNR | Order Number | AUFNR | AUFK | CHAR | 12 | 0 | ||||||||||||||||||
BAUGR | Material number of higher-level assembly | BAUGR | MARA | CHAR | 18 | 0 | ||||||||||||||||||
SERNR | BOM explosion number | SERNR | SNUM | CHAR | 8 | 0 | ||||||||||||||||||
KDAUF | Sales Order Number | KDAUF | VBUK | CHAR | 10 | 0 | ||||||||||||||||||
KDPOS | Item Number in Sales Order | KDPOS | NUMC | 6 | 0 | |||||||||||||||||||
KDEIN | Delivery Schedule for Sales Order | KDEIN | NUMC | 4 | 0 | |||||||||||||||||||
PROJN | Old: Project number : No longer used --> PS_POSNR | PROJN | CHAR | 16 | 0 | |||||||||||||||||||
BWART | Movement Type (Inventory Management) | BWART | T156 | CHAR | 3 | 0 | ||||||||||||||||||
SAKNR | G/L Account Number | SAKNR | CHAR | 10 | 0 | |||||||||||||||||||
GSBER | Business Area | GSBER | TGSB | CHAR | 4 | 0 | ||||||||||||||||||
UMWRK | Receiving/Issuing Plant | UMWRK | T001W | CHAR | 4 | 0 | ||||||||||||||||||
UMLGO | Receiving/Issuing Storage Location | UMLGO | T001L | CHAR | 4 | 0 | ||||||||||||||||||
NAFKZ | Indicator: follow-up material active/not active | NAFKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
NOMAT | Follow-Up/Original Material | NOMAT | MARA | CHAR | 18 | 0 | ||||||||||||||||||
NOMNG | Required quantity | NOMNG | QUAN | 13 | 3 | |||||||||||||||||||
POSTP | Item Category (Bill of Material) | POSTP | T418 | CHAR | 1 | 0 | ||||||||||||||||||
POSNR | BOM item number | APOSN | CHAR | 4 | 0 | |||||||||||||||||||
ROMS1 | Size 1 | ROMS1 | QUAN | 13 | 3 | |||||||||||||||||||
ROMS2 | Size 2 | ROMS2 | QUAN | 13 | 3 | |||||||||||||||||||
ROMS3 | Size 3 | ROMS3 | QUAN | 13 | 3 | |||||||||||||||||||
ROMEI | Unit of measure for sizes 1 to 3 | ROMEI | T006 | UNIT | 3 | 0 | ||||||||||||||||||
ROMEN | Quantity of variable-size item | ROMEN | QUAN | 13 | 3 | |||||||||||||||||||
SGTXT | Item Text | SGTXT | CHAR | 50 | 0 | |||||||||||||||||||
LMENG | Required quantity for mat.management in stockkeeping units | LMENG | QUAN | 13 | 3 | |||||||||||||||||||
ROHPS | Variable-sized item indicator | ROHPS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
RFORM | Formula key | RFORM | T418F | CHAR | 2 | 0 | ||||||||||||||||||
ROANZ | Number of variable-size items | ROANZ | QUAN | 13 | 3 | |||||||||||||||||||
FLMNG | Shortfall quantity of the component in the order | FLMNG | QUAN | 13 | 3 | |||||||||||||||||||
STLTY | BOM category | STLTY | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
STLNR | Bill of material | STNUM | CHAR | 8 | 0 | |||||||||||||||||||
STLKN | BOM item node number | STLKN | NUMC | 8 | 0 | |||||||||||||||||||
STPOZ | Internal counter | CIM_COUNT | NUMC | 8 | 0 | |||||||||||||||||||
LTXSP | Language: The long text was stored in this language | LTXSP | T002 | LANG | 1 | 0 | ||||||||||||||||||
POTX1 | BOM Item Text (Line 1) | POTX1 | CHAR | 40 | 0 | |||||||||||||||||||
POTX2 | BOM item text (line 2) | POTX2 | CHAR | 40 | 0 | |||||||||||||||||||
SANKA | Indicator for Relevancy to Costing | CK_SELKZ | TCK08 | CHAR | 1 | 0 | ||||||||||||||||||
ALPOS | Alternative item indicator | ALTPS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
EWAHR | Usage probability in % (alternative item) | EWAHR | DEC | 3 | 0 | |||||||||||||||||||
AUSCH | Component scrap in percent | KAUSF | DEC | 5 | 2 | |||||||||||||||||||
AVOAU | Operation scrap | AVOAU | DEC | 5 | 2 | |||||||||||||||||||
NETAU | Indicator: Net scrap | NETAU | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
NLFZT | Lead-time offset | NLFZT | DEC | 3 | 0 | |||||||||||||||||||
AENNR | Change Number | AENNR | AENR | CHAR | 12 | 0 | ||||||||||||||||||
UMREZ | Numerator for Conversion to Base Units of Measure | UMREZ | DEC | 5 | 0 | |||||||||||||||||||
UMREN | Denominator for conversion to base units of measure | UMREN | DEC | 5 | 0 | |||||||||||||||||||
SORTF | Sort String | SORTP | CHAR | 10 | 0 | |||||||||||||||||||
SBTER | Latest requirements date | SBTER | DATS | 8 | 0 | |||||||||||||||||||
VERTI | MRP Distribution Key | SA_VERTL | T437V | CHAR | 4 | 0 | ||||||||||||||||||
SCHGT | Indicator: Bulk Material | SCHGT | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
UPSKZ | Indicator: sub-items exist | UPSKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
DBSKZ | Direct procurement indicator | DBSKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
TXTPS | Item text indicator | TXTPS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
DUMPS | Phantom item indicator | DUMPS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
BEIKZ | Material Provision Indicator | BEIKZ | T417 | CHAR | 1 | 0 | ||||||||||||||||||
ERSKZ | Indicator: spare part | ERSKZ | T413 | CHAR | 1 | 0 | ||||||||||||||||||
AUFST | Order level | AUFST | NUMC | 2 | 0 | |||||||||||||||||||
AUFWG | Order path | AUFWG | NUMC | 2 | 0 | |||||||||||||||||||
BAUST | Assembly order level | BAUST | NUMC | 2 | 0 | |||||||||||||||||||
BAUWG | Assembly order path | BAUWG | NUMC | 2 | 0 | |||||||||||||||||||
AUFPS | Order item number | AUFPS | CHAR | 2 | 0 | |||||||||||||||||||
EBELN | Purchasing Document Number | EBELN | EKKO | CHAR | 10 | 0 | ||||||||||||||||||
EBELP | Item Number of Purchasing Document | EBELP | EKPO | NUMC | 5 | 0 | ||||||||||||||||||
EBELE | Delivery Schedule Line Counter | EETEN | EKET | NUMC | 4 | 0 | ||||||||||||||||||
KNTTP | Account Assignment Category | KNTTP | T163K | CHAR | 1 | 0 | ||||||||||||||||||
KZVBR | Consumption Posting | KZVBR | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
PSPEL | WBS Element | PS_POSNR | NUMC | 8 | 0 | |||||||||||||||||||
AUFPL | Routing number of operations in the order | CO_AUFPL | NUMC | 10 | 0 | |||||||||||||||||||
PLNFL | Sequence | PLNFOLGE | CHAR | 6 | 0 | |||||||||||||||||||
VORNR | Operation/Activity Number | VORNR | CHAR | 4 | 0 | |||||||||||||||||||
APLZL | Internal counter | CIM_COUNT | NUMC | 8 | 0 | |||||||||||||||||||
OBJNR | Object number | J_OBJNR | ONR00 | CHAR | 22 | 0 | ||||||||||||||||||
FLGAT | Sequence category | FOLGENART | TCA07 | CHAR | 1 | 0 | ||||||||||||||||||
GPREIS | Price in component currency | PPCOMP | CURR | 15 | 2 | |||||||||||||||||||
FPREIS | Fixed Price in Foreign Currency | OPREIFX | CURR | 15 | 2 | |||||||||||||||||||
PEINH | Price Unit | PEINH | DEC | 5 | 0 | |||||||||||||||||||
RGEKZ | Indicator: Backflush | RGEKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
EKGRP | Purchasing Group | EKGRP | T024 | CHAR | 3 | 0 | ||||||||||||||||||
ROKME | Unit of measure for variable-size component | ROKME | T006 | UNIT | 3 | 0 | ||||||||||||||||||
ZUMEI | Unit for cutting measures | DZUMEI | T006 | UNIT | 3 | 0 | ||||||||||||||||||
ZUMS1 | Cutting measure 1 | DZUMS1 | QUAN | 13 | 3 | |||||||||||||||||||
ZUMS2 | Cutting measure 2 | DZUMS2 | QUAN | 13 | 3 | |||||||||||||||||||
ZUMS3 | Cutting measure 3 | DZUMS3 | QUAN | 13 | 3 | |||||||||||||||||||
ZUDIV | Integral divisor for cutting measures | DZUDIV | NUMC | 5 | 0 | |||||||||||||||||||
VMENG | Confirmed quantity for availability check in SKU | VMENG | QUAN | 15 | 3 | |||||||||||||||||||
PRREG | Checking Rule for Availability Check | PRREG | T441R | CHAR | 2 | 0 | ||||||||||||||||||
LIFZT | Delivery time in days | LIFZT | DEC | 3 | 0 | |||||||||||||||||||
CUOBJ | Configuration (internal object number) | CUOBJ | NUMC | 18 | 0 | |||||||||||||||||||
KFPOS | Indicator: "configurable item" | KFPOS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
REVLV | Revision Level | REVLV | CHAR | 2 | 0 | |||||||||||||||||||
BERKZ | Material Staging Indicator for Production Supply | BERKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
LGNUM | Warehouse Number / Warehouse Complex | LGNUM | T300 | CHAR | 3 | 0 | ||||||||||||||||||
LGTYP | Storage Type | LGTYP | T301 | CHAR | 3 | 0 | ||||||||||||||||||
LGPLA | Storage Bin | LGPLA | LAGP | CHAR | 10 | 0 | ||||||||||||||||||
TBMNG | Transfer requirement quantity already requested | TBMNG | QUAN | 13 | 3 | |||||||||||||||||||
NPTXTKY | Internal text number (12-character) | TXTKY | CHAR | 12 | 0 | |||||||||||||||||||
KBNKZ | Kanban Indicator | KBNKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
KZKUP | Indicator: co-product | KZKUP | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
AFPOS | Order Item Number | CO_POSNR | NUMC | 4 | 0 | |||||||||||||||||||
NO_DISP | Effective for Materials Planning | NO_DISP_PLUS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
BDZTP | Time that reservation quantity required | BDZTP | TIMS | 6 | 0 | |||||||||||||||||||
ESMNG | Usage quantity per order unit of measure | ESMNG | FLTP | 16 | 16 | |||||||||||||||||||
ALPGR | Alternative item: group | CS_ALPGR | CHAR | 2 | 0 | |||||||||||||||||||
ALPRF | Alternative item: ranking order | CS_ALPRF | NUMC | 2 | 0 | |||||||||||||||||||
ALPST | Alternative item: strategy | CS_ALPST | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
KZAUS | Discontinuation type | AUSLF | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
NFEAG | Discontinuation group | CS_NFEAG | CHAR | 2 | 0 | |||||||||||||||||||
NFPKZ | Indicator: Follow-Up Item | CS_KZNFP | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
NFGRP | Follow-up group | CS_NFGRP | CHAR | 2 | 0 | |||||||||||||||||||
NFUML | NOT USED: Quantity transfer factor for follow-up material | NFUML | DEC | 5 | 4 | |||||||||||||||||||
ADRNR | Addresses: Address Number | CADNR | CHAR | 10 | 0 | |||||||||||||||||||
CHOBJ | Internal object number of the batch classification | CUOBJ_CH | NUMC | 18 | 0 | |||||||||||||||||||
SPLKZ | Batch key | CHSPLIT | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
SPLRV | Item Number of Reservation/Dependent Requirement | RSPOS | NUMC | 4 | 0 | |||||||||||||||||||
KNUMH | Number of condition record from batch determination | KNUMH_CH | CHAR | 10 | 0 | |||||||||||||||||||
WEMPF | Goods Recipient/Ship-To Party | WEMPF | CHAR | 12 | 0 | |||||||||||||||||||
ABLAD | Unloading Point | ABLAD | CHAR | 25 | 0 | |||||||||||||||||||
HKMAT | Material-related origin | HKMAT | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
HRKFT | Origin Group as Subdivision of Cost Element | HRKFT | CHAR | 4 | 0 | |||||||||||||||||||
VORAB | Ind: Preliminary order | VORABKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
MATKL | Material Group | MATKL | T023 | CHAR | 9 | 0 | ||||||||||||||||||
FRUNV | Indicator: External procurement data incomplete | FRUNV | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
CLAKZ | Indicator: classification exists | CLAKZ | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
INPOS | Indicator: intra material | INPOS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
WEBAZ | Goods Receipt Processing Time in Days | WEBAZ | DEC | 3 | 0 | |||||||||||||||||||
LIFNR | Account Number of Vendor or Creditor | LIFNR | LFA1 | CHAR | 10 | 0 | ||||||||||||||||||
FLGEX | Indicator: External procurement | FLGEX | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
FUNCT | Distribution function | CY_FUNCT | TC29V | CHAR | 3 | 0 | ||||||||||||||||||
GPREIS_2 | Total Price in Local Currency | PPGXXX | CURR | 15 | 2 | |||||||||||||||||||
FPREIS_2 | Fixed Price in Local Currency | PPFXXX | CURR | 15 | 2 | |||||||||||||||||||
PEINH_2 | Price Unit | PEINH | DEC | 5 | 0 | |||||||||||||||||||
INFNR | Number of Purchasing Info Record | INFNR | EINA | CHAR | 10 | 0 | ||||||||||||||||||
KZECH | Determination of batch entry in the production/process order | KZECH | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
KZMPF | Manual Maintenance of Requirement Date | KZMPF | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
STLAL | Alternative BOM | STALT | CHAR | 2 | 0 | |||||||||||||||||||
PBDNR | Requirements Plan Number | PBDNR | CHAR | 10 | 0 | |||||||||||||||||||
STVKN | Inherited node number of BOM item | STVKN | NUMC | 8 | 0 | |||||||||||||||||||
KTOMA | Acct entered manually | KTOMA | CHAR | 1 | 0 | |||||||||||||||||||
VRPLA | Indicator: planning without final assembly | VRPLA | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
KZBWS | Valuation of Special Stock | KZBWS | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
NLFZV | Lead-time offset for operation | CS_NLFZV | DEC | 3 | 0 | |||||||||||||||||||
NLFMV | Unit for lead-time offset for operation | CS_NLFMV | T006 | UNIT | 3 | 0 | ||||||||||||||||||
TECHS | Parameter Variant/Standard Variant | TECHS | CHAR | 12 | 0 | |||||||||||||||||||
OBJTYPE | Change indicator | OCM_OBJ_TYPE | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
CH_PROC | Process that has lead to the change of an object | OCM_CH_PROC | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
FXPRU | Fixed-Price Co-Product | CK_FIXPRKU | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
UMSOK | Special Stock Indicator for Physical Stock Transfer | UMSOK | CHAR | 1 | 0 | |||||||||||||||||||
VORAB_SM | Advance Shipment Indicator | VORAB_SM | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
FIPOS | Commitment Item | FIPOS | CHAR | 14 | 0 | |||||||||||||||||||
FIPEX | Commitment Item | FM_FIPEX | CHAR | 24 | 0 | |||||||||||||||||||
FISTL | Funds Center | FISTL | CHAR | 16 | 0 | |||||||||||||||||||
GEBER | Fund | BP_GEBER | CHAR | 10 | 0 | |||||||||||||||||||
GRANT_NBR | Grant | GM_GRANT_NBR | CHAR | 20 | 0 | |||||||||||||||||||
FKBER | Functional Area | FKBER | CHAR | 16 | 0 | |||||||||||||||||||
PRIO_URG | Requirement Urgency | PRIO_URG | PURG | NUMC | 2 | 0 | ||||||||||||||||||
PRIO_REQ | Requirement Priority | PRIO_REQ | PREQ | NUMC | 3 | 0 | ||||||||||||||||||
KBLNR | Document Number for Earmarked Funds | KBLNR | CHAR | 10 | 0 | |||||||||||||||||||
KBLPOS | Earmarked Funds: Document Item | KBLPOS | NUMC | 3 | 0 | |||||||||||||||||||
BUDGET_PD | FM: Budget Period | FM_BUDGET_PERIOD | CHAR | 10 | 0 | |||||||||||||||||||
SC_OBJECT_ID | Object ID - Document Number | /SRMERP/OBJECT_ID | CHAR | 10 | 0 | |||||||||||||||||||
SC_ITM_NO | Internal Shopping Cart Item Number | /SRMERP/SC_ITM_NO | INT4 | 10 | 0 | |||||||||||||||||||
ADVCODE | Advice Code | /ISDFPS/ADVCODE | /ISDFPS/ADVCODE1 | CHAR | 2 | 0 | ||||||||||||||||||
OIO_SPROC | Supply Process | OIO_SPROC | OIO_CM_SPROC | CHAR | 4 | 0 | ||||||||||||||||||
OIO_HOLD | Indicator: Hold Delivery Onshore | OIO_HOLD | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
WTY_IND | Warranty indicator | WTYSC_WTY_INDICATOR | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
R_PART_INDICATOR | Return Part Indicator | WTYSC_RETURN_PART_INDICATOR | CHAR | 1 | 0 |
Possible values
|
||||||||||||||||||
WTYSC_CLMITEM | Claim item number | WTYSC_CLMITEM | CHAR | 16 | 0 |
RESB foreign key relationships
Table | Field | Foreign key table | Foreign key field | Check table | Check field | |
---|---|---|---|---|---|---|
RESB | ADVCODE | RESB | MANDT | /ISDFPS/ADVCODE1 | Advice Code | MANDT |
RESB | ADVCODE | RESB | ADVCODE | /ISDFPS/ADVCODE1 | Advice Code | ADVCODE |
RESB | AENNR | RESB | MANDT | AENR | Change Master | MANDT |
RESB | AENNR | RESB | AENNR | AENR | Change Master | AENNR |
RESB | AUFNR | RESB | MANDT | AUFK | Order master data | MANDT |
RESB | AUFNR | RESB | AUFNR | AUFK | Order master data | AUFNR |
RESB | BAUGR | RESB | MANDT | MARA | General Material Data | MANDT |
RESB | BAUGR | RESB | BAUGR | MARA | General Material Data | MATNR |
RESB | BEIKZ | RESB | BEIKZ | T417 | Material Provision Indicators | BEIKZ |
RESB | BEIKZ | RESB | MANDT | T417 | Material Provision Indicators | MANDT |
RESB | BNFPO | RESB | MANDT | EBAN | Purchase Requisition | MANDT |
RESB | BNFPO | RESB | BANFN | EBAN | Purchase Requisition | BANFN |
RESB | BNFPO | RESB | BNFPO | EBAN | Purchase Requisition | BNFPO |
RESB | BWART | RESB | BWART | T156 | Movement Type | BWART |
RESB | BWART | RESB | MANDT | T156 | Movement Type | MANDT |
RESB | CHARG | RESB | MANDT | MCHA | Batches | MANDT |
RESB | CHARG | RESB | MATNR | MCHA | Batches | MATNR |
RESB | CHARG | RESB | WERKS | MCHA | Batches | WERKS |
RESB | CHARG | RESB | CHARG | MCHA | Batches | CHARG |
RESB | EBELE | RESB | MANDT | EKET | Scheduling Agreement Schedule Lines | MANDT |
RESB | EBELE | RESB | EBELN | EKET | Scheduling Agreement Schedule Lines | EBELN |
RESB | EBELE | RESB | EBELP | EKET | Scheduling Agreement Schedule Lines | EBELP |
RESB | EBELE | RESB | EBELE | EKET | Scheduling Agreement Schedule Lines | ETENR |
RESB | EBELN | RESB | MANDT | EKKO | Purchasing Document Header | MANDT |
RESB | EBELN | RESB | EBELN | EKKO | Purchasing Document Header | EBELN |
RESB | EBELP | RESB | MANDT | EKPO | Purchasing Document Item | MANDT |
RESB | EBELP | RESB | EBELN | EKPO | Purchasing Document Item | EBELN |
RESB | EBELP | RESB | EBELP | EKPO | Purchasing Document Item | EBELP |
RESB | EKGRP | RESB | MANDT | T024 | Purchasing Groups | MANDT |
RESB | EKGRP | RESB | EKGRP | T024 | Purchasing Groups | EKGRP |
RESB | ERFME | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | ERFME | RESB | ERFME | T006 | Units of Measurement | MSEHI |
RESB | ERSKZ | RESB | MANDT | T413 | Spare Part Indicators | MANDT |
RESB | ERSKZ | RESB | ERSKZ | T413 | Spare Part Indicators | ERSKZ |
RESB | FLGAT | RESB | FLGAT | TCA07 | Sequence categories | FLGAT |
RESB | FUNCT | RESB | MANDT | TC29V | Distribution function | MANDT |
RESB | FUNCT | RESB | FUNCT | TC29V | Distribution function | FUNCT |
RESB | GSBER | RESB | MANDT | TGSB | Business Areas | MANDT |
RESB | GSBER | RESB | GSBER | TGSB | Business Areas | GSBER |
RESB | INFNR | RESB | INFNR | EINA | Purchasing Info Record: General Data | INFNR |
RESB | INFNR | RESB | MANDT | EINA | Purchasing Info Record: General Data | MANDT |
RESB | KDAUF | RESB | MANDT | VBUK | Sales Document: Header Status and Administrative Data | MANDT |
RESB | KDAUF | RESB | KDAUF | VBUK | Sales Document: Header Status and Administrative Data | VBELN |
RESB | KNTTP | RESB | MANDT | T163K | Account Assignment Categories in Purchasing Document | MANDT |
RESB | KNTTP | RESB | KNTTP | T163K | Account Assignment Categories in Purchasing Document | KNTTP |
RESB | LGNUM | RESB | MANDT | T300 | WM Warehouse Numbers | MANDT |
RESB | LGNUM | RESB | LGNUM | T300 | WM Warehouse Numbers | LGNUM |
RESB | LGORT | RESB | MANDT | T001L | Storage Locations | MANDT |
RESB | LGORT | RESB | WERKS | T001L | Storage Locations | WERKS |
RESB | LGORT | RESB | LGORT | T001L | Storage Locations | LGORT |
RESB | LGPLA | RESB | MANDT | LAGP | Storage bins | MANDT |
RESB | LGPLA | RESB | LGNUM | LAGP | Storage bins | LGNUM |
RESB | LGPLA | RESB | LGTYP | LAGP | Storage bins | LGTYP |
RESB | LGPLA | RESB | LGPLA | LAGP | Storage bins | LGPLA |
RESB | LGTYP | RESB | MANDT | T301 | WM Storage Types | MANDT |
RESB | LGTYP | RESB | LGNUM | T301 | WM Storage Types | LGNUM |
RESB | LGTYP | RESB | LGTYP | T301 | WM Storage Types | LGTYP |
RESB | LIFNR | RESB | MANDT | LFA1 | Vendor Master (General Section) | MANDT |
RESB | LIFNR | RESB | LIFNR | LFA1 | Vendor Master (General Section) | LIFNR |
RESB | LTXSP | RESB | LTXSP | T002 | Language Keys (Component BC-I18) | SPRAS |
RESB | MANDT | RESB | MANDT | T000 | Clients | MANDT |
RESB | MATKL | RESB | MANDT | T023 | Material Groups | MANDT |
RESB | MATKL | RESB | MATKL | T023 | Material Groups | MATKL |
RESB | MATNR | RESB | MANDT | MARA | General Material Data | MANDT |
RESB | MATNR | RESB | MATNR | MARA | General Material Data | MATNR |
RESB | MEINS | RESB | MEINS | T006 | Units of Measurement | MSEHI |
RESB | MEINS | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | NLFMV | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | NLFMV | RESB | NLFMV | T006 | Units of Measurement | MSEHI |
RESB | NOMAT | RESB | NOMAT | MARA | General Material Data | MATNR |
RESB | NOMAT | RESB | MANDT | MARA | General Material Data | MANDT |
RESB | OBJNR | RESB | MANDT | ONR00 | General Object Number | MANDT |
RESB | OBJNR | RESB | OBJNR | ONR00 | General Object Number | OBJNR |
RESB | OIO_SPROC | SYST | MANDT | OIO_CM_SPROC | RLM Supply Process (IS-Oil Remote Logistics Management) | MANDT |
RESB | OIO_SPROC | RESB | OIO_SPROC | OIO_CM_SPROC | RLM Supply Process (IS-Oil Remote Logistics Management) | SPROC |
RESB | PLNUM | RESB | MANDT | PLAF | Planned Order | MANDT |
RESB | PLNUM | RESB | PLNUM | PLAF | Planned Order | PLNUM |
RESB | POSTP | RESB | MANDT | T418 | Item Categories | MANDT |
RESB | POSTP | RESB | POSTP | T418 | Item Categories | POSTP |
RESB | PRIO_REQ | RESB | MANDT | PREQ | Requirement Priorities | MANDT |
RESB | PRIO_REQ | RESB | PRIO_REQ | PREQ | Requirement Priorities | PRIO_REQ |
RESB | PRIO_URG | RESB | MANDT | PURG | Requirement Urgencies | MANDT |
RESB | PRIO_URG | RESB | PRIO_URG | PURG | Requirement Urgencies | PRIO_URG |
RESB | PRREG | RESB | MANDT | T441R | Values Table for Checking Rule | MANDT |
RESB | PRREG | RESB | PRREG | T441R | Values Table for Checking Rule | PRREG |
RESB | RFORM | RESB | MANDT | T418F | Variable-Size Item Formulas | MANDT |
RESB | RFORM | RESB | RFORM | T418F | Variable-Size Item Formulas | RFORM |
RESB | ROKME | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | ROKME | RESB | ROKME | T006 | Units of Measurement | MSEHI |
RESB | ROMEI | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | ROMEI | RESB | ROMEI | T006 | Units of Measurement | MSEHI |
RESB | SANKA | RESB | MANDT | TCK08 | Indicator for Relevancy to Costing | MANDT |
RESB | SANKA | RESB | SANKA | TCK08 | Indicator for Relevancy to Costing | SELKZ |
RESB | SERNR | RESB | SERNR | SNUM | BOM explosion number | SERNR |
RESB | SERNR | RESB | MANDT | SNUM | BOM explosion number | MANDT |
RESB | SOBKZ | RESB | MANDT | T148 | Special Stock Indicator | MANDT |
RESB | SOBKZ | RESB | SOBKZ | T148 | Special Stock Indicator | SOBKZ |
RESB | UMLGO | RESB | MANDT | T001L | Storage Locations | MANDT |
RESB | UMLGO | RESB | UMWRK | T001L | Storage Locations | WERKS |
RESB | UMLGO | RESB | UMLGO | T001L | Storage Locations | LGORT |
RESB | UMWRK | RESB | MANDT | T001W | Plants/Branches | MANDT |
RESB | UMWRK | RESB | UMWRK | T001W | Plants/Branches | WERKS |
RESB | VERTI | RESB | MANDT | T437V | Distribution key in MRP | MANDT |
RESB | VERTI | RESB | WERKS | T437V | Distribution key in MRP | WERKS |
RESB | VERTI | RESB | VERTI | T437V | Distribution key in MRP | VERTL |
RESB | WAERS | RESB | WAERS | TCURC | Currency Codes | WAERS |
RESB | WAERS | RESB | MANDT | TCURC | Currency Codes | MANDT |
RESB | WERKS | RESB | WERKS | T001W | Plants/Branches | WERKS |
RESB | WERKS | RESB | MANDT | T001W | Plants/Branches | MANDT |
RESB | ZUMEI | RESB | MANDT | T006 | Units of Measurement | MANDT |
RESB | ZUMEI | RESB | ZUMEI | T006 | Units of Measurement | MSEHI |